background image

          

CREATED ON: April 28, 2016

 

 

1. Top Display Window 

2. Bottom Display Window  

3. Previous button 

4. Scroll/Hold button 

5. Next button 

6. Select button 

7. Advance button 

8. Pulse Constant 

                                                

Instruction Manual

 

 

 

EMS-03 V4.0 

KWh Meter 

 

                                         

 

                             

                                                                      

                                                            

EAPL

 

 

 

    Introduction 

 
 
 
 
 

 

 

 

 

 

 

 

 

 

 

 

 

    

        

Box Accessories

 

        One (1) EMS-03 digital meter         
        One (1) Instruction Manual 
        One (1) test and Calibration certificate for energy meter   
        Side Anchor (2 nos.) 

 

PARAMETERS 

T PF

 

T W

 

Active Energy (KWh)

 

Active Energy (MWh)

 

Device ID       

(Communication Status)

 

 

 
Safety Precautions

 

Read and follow all the safety precautions and instructions before 
installing and working with the equipment. 

                         !   

DANGER 

HAZARD OF ELECTRIC SHOCK, EXPLOSION OR ARC FLASH 

 

Apply appropriate personal protective equipment(PPE) and follow 
safety work practices 

 

Only qualified electrical workers should install this equipment. Such work 
should be performed only after reading this entire set of instructions. 

 

If the equipment is not used in the manner specified by the 
manufacturer, the protection provided by the equipment may be 
impaired. 

 

NEVER work alone. 

 

Turn OFF all power supplying the energy meter and the equipment in 
which it is installed before working on it. 

 

The successful operation of this equipment depends upon proper 
handling, installation and operation. Neglecting fundamental installation 
requirements may lead to personal injury as well as damage to 
electrical equipment or other property. 

 

NEVER bypass external fusing.

 

 

 

NEVER short the secondary of PT 

 

NEVER open circuit a CT; use the shorting block to short circuit the leads 
of CT before removing the connection from energy meter. 

 

Before performing Dielectric or Megger testing on any equipment in 
which the energy meter is installed, disconnect all the input and output 
wires to the energy meter. High voltage testing may damage electronic 
components contained in the energy meter. 

 

The energy meter should be installed in a suitable electrical enclosure. 

       Failure to follow these instructions will result in death or serious injury.

 

 

EAPL is not responsible for any consequential damages arising out of

 

use 

of our products, though the technology is cautiously chosen and 
implemented like any other well designed good electric meter. 

 

Installation

 

Connecting cable recommendations

 

 

Insulation rating 

Current rating 

Voltage circuit 

>600 VAC 

     > 0.1A 

Current circuit 

>600 VAC 

>7.5A/2.5mm

2

14AWG minimum 

 

      

Tools and Fasteners 

Kindly use star – type screw driver for tightening the screws. 
 

NOTE:

 Installation should include a disconnecting device, like switch or 

circuit breaker, with clear ON/OFF markings, to turn-off the auxiliary 
supply (control power).The disconnecting device should be within the 
reach of the equipment and the operator. 

 

 
Dimension                             

   

Note: All Dimensions are in mm.

 

  

 Front Panel

 

 

 

   Rear Panel 

 

 

 
 
 
 
 
 
 
 

 

         

 

 

Page 1 of 2 

OD RE YN 380011 REV 02/28-04-16

 

Отзывы: