background image

Содержание MX-9A

Страница 1: ...TP0 9 TP0 9A MX 9A 9000LBS CLEAR FLOOR ASSYMETRIC LIFTS INSTALLATION AND OPERATION MANUAL DATE INSTALLED _ _ _ _ __ SERIAL _ _ _ _ _ __ EAGLE ...

Страница 2: ... J INSTALLATION AND OPERATION MANUAL MODEL TP0 9 TPO s A MIN POST LIFTS h lll 1 i i 11 r ll fl 11 It 11 1 II i T 0 3f i PO S 1 ti Fer technical support or service cau eao _535 0016 ...

Страница 3: ... 4 ITelescoping arms 1 I Overhead beam In Parts Box I 1 r 7i hose 1 I ti hos 0 4 Arm pivot prns 4 1Truck adaoter I 4 l Scinwos 12 I Anchor batts 1 i Catalca 1 i Smat parts b sg _ Small Parts 8aa ii16 wire I i 2 1 srn 1 s I 2 1 5_ cice fer oiston I 1 St thread TwiO ina I I V 2 FM elbow t I I w 4 i 6 1S ni Joc nuts 4 5116 18 nuts 4 _ 5 16 x 1 hex bolts 15 i Shims 2 I ciugs I I I I I I I i I I f i ...

Страница 4: ...ns ar c install tap team Step 4 Step 5 Step 6 Step 7 Step 9 Step 10 Operation lnstail anchor bolts and re eve c umns lr stail and adjust cables Install power unit hoses and cut cff cable lns al arms Install spinup pads anc check hslglit adapters Test and adjust lift Learn proper cperaticn and recheck lift components Maintenance Schedule Please read and fellow the maintenance guide Troubleshooting ...

Страница 5: ...cf the vehicle only Dor ct attempt ta ift cr iy art of the vehic e lmprc sr use of t his Ci i msr t c Ju d resuit in cat 1age to the ift yaursalf er ether praparty The iift is 1ntsr ce tc lift vehic es cr ly It is nc cesighat ta ift ar y ers er equipmem c ntaining persons AH psrsons ust c this equicrnent should be cua ified resconslc s cerscns t J I I si oulc _ r ea cer I n d s t y C t 1neA s t 1 ...

Страница 6: ...r t of the shop Now snap a chalk line between the two marks this is the csr tsr line fer your lift Measure 71 TP0 9A or68 TP0 9 from the center line to each s ce cf the csnte Hne atfront 21 t r r of the shoo Snao two mere lines Ihes are ycl I lift s 01 ter dimensions Sf e Figure 1 I 4 MIN 2 I OFmAAL i WAW S AC NG C fflR l UNE J i l r I I i I I i l I I 1 i 1 i O aA il O SA 58 I 83 1 0 8 T c a I I C...

Страница 7: ... deer snap hcrizantal chalk line as shown Use square and measure 12 from gen sid f previous chalk line on each side and snap horizontal chalk line as shewn WORKBENCH cmm R LINS 1 1 c I Ui E T SHCFARE GURE2A fer i O SA WORKBENCH I r I t r UNI I i I i PTmt r y I I I I r I UNI I I SHOFAREA l L FiGURE2S fer TP0 9 ...

Страница 8: ...tand the column up and assemble the nipple and the elbow fitting into the rear facing port using Teflon tape Se sure the elbow fitting is facing up when tight see Figure 3 Repeat this process far the other side MAINS OE PC NE UNIT CYWNOER 7 INSiAU 0 NIPPL USETEFt ON I T A S ON Tri RS ADS l I i I INSTALL i I 90 01 G FITTIN i I MAK c SURE FrrTlNGf u rs OINTING ul WAAD t OFFSiDE CYLJNCSR F1GURE 3 i I...

Страница 9: ...in Figure 4 We rec l 7 imend placing the power unit on the passanger sfda far ease of operation lnstail the uprights so the threaded rod at ths tcp face each other the thrsaded rads should facs the center llne Hand tighten fer now Using a four foot level fiat washers and shims provideq shir 7 the colt mns level front to back and side tc sk s ReG isck the uprights tc see that they are facing each o...

Страница 10: ...ta keep the columns even en the basalina The outer c1mensions are not as import nt ct this pafnt Check tcp fer space between the upright and top beam You shoulc haVe less than between If you have rncra tighten nuts at top beam on both sides1 c re evel the c Iumns NOTc Double check f verything now next step is permanent I I t ii l i i j _ OFr S OE UFRIGHT FIGURE 5 CROSS BAR Iii 11 l v I i II tj II ...

Страница 11: ... 1t n g t i 1 n a 11 cit ic a thQ c I 1c JL 1 lll i 1 1oi 4 v1 t i L 1 1 u 1 _ i_ leve as you can et yc J Nill hsve a geed solid instai ation am yaars c tr u e free ssrvica Step S lnstaH and adjust cables Using two people afcr ift er shop crane lift each carriage to the ssc nd er third leek Allow eac carriage to rast en the locl s and me sute each side tc t e sure t ey are at the sams height Unwra...

Страница 12: ...ight side and running it ever the back pufleys with beth cables in placs you ars ready to adjust Start on the left sic s With a pair of vice grips grab the t iqttam of the shai where thrsads are pcintir up Placs an 11 16 deep socket an the nut and tighten it until the cable wiU iv about 11 when ycu push on it Repeat for opposite side Bath cabtes si ct c no iv have the same tension If locks don t h...

Страница 13: ...fitting found in the parts ex Screw in the T until the 0 ring touches the pump and the ends ara fac r g tr e tcp cf he motor and the bottom cf the tank Then use an 11 16 wrer c i tc tighten t 1e tocking nut and assure a good saa L Next usa a screwdriver to prJ df the 1 plastic cap from the t_ank Place a funnel in the hole and fill tha ta k wit 3 5 gallons of AW J2 hydrau iic oil TYPE HOSE I I I i ...

Страница 14: ...e they are tight to avoid leaks Attach the 1 16 cable tc the flat washer at the tao cf the left srde uoricht usir c I W the small aluminum fern iies Loop the cable thrm h the ferrule tnen through the washer 2nd back t ircuGh the ferrule Crimp the ferr fe to hcid the ca Pass the cable ti irOuGh the washer en tha right side anc dov rn through the srr 1 belt hcle in the middle cf die upright Loop the...

Страница 15: ...Installation Manual TP0 9 TP0 9A TYPICAL SWING ARM INSTALLATION FIGURE 78 0 T 0 9 TP 14 II i 1 1 11 I r n i If I I 11 1 II it II r 1 Ii I I I I 1 11 11 ri 711 l t 1 l I POWE ...

Страница 16: ...31 2 2 11 MIN J _ 3 21 MIM t filIE MIN MAX DIMENSIONS FOR RtCTANCULAR LIFT POINTS E E ll WICCS 11mNH w I AJIIH 11 1 J_A G L uliAWSn TONY WARMACK I irL t t1n1ufucl u_ring Coq1 r 12 t8 0 qsirnn 1 1 8l 5 Ue lt1 UtllOhuy _L ttuu la111 TGOC U mu ARM REACH DIMENSIONS TP0 9A 1OA PHtT 1 RtFERENCEI f ROOS 7 1 lsY i i _ ...

Отзывы: