manualshive.com logo in svg
background image

ASSEMBLY INSTRUCTIONS

Spec-Bar

®

Single Speed Rails

CAUTION

inSPECt COntEntS iMMEDiAtELY AnD FiLE CLAiM WitH DELiVERinG CARRiER FOR AnY DAMAGE. 

SAVE YOUR BOX AND ALL PACKING MATERIALS.

YOu ARE RESPOnSiBLE FOR DAMAGE tO YOuR unit iF REtuRnED 

iMPROPERLY PACKED. 

inStRuCtiOn SHEEt

#389291

Eagle Foodservice Equipment, Eagle MHC, and SpecFAB

®

are divisions of Eagle Group. ©2021 by the Eagle Group

• 100 Industrial Boulevard, Clayton, Delaware 19938-8903 U.S.A.

• Phone: 302/653-3000 • 800/441-8440

• Fax: 302/653-2065 • www.eaglegrp.com 

Step 1 - Assemble bottle support and

one of the brackets. 

• Lay bottle support with

solid plastic side up. 

• Insert screws through left

or right bracket, as shown.

DO NOT FULLY TIGHTEN. 

Step 2 - Install remaining bracket. 

Insert screws through

bracket, as shown. DO

NOT FULLY TIGHTEN. 

Step 3 - Install bottle stay.

IMPORTANT: Make sure

the solid plastic surface

faces the REAR of the

speed rail. 

Insert screws through

brackets, as shown. DO

NOT FULLY TIGHTEN. 

Tighten all screws securely

AFTER installing speed rail

onto your equipment. 

See reverse side for Spec-Bar

®

Double Speed Rails. 

EG9943       Revised 05/21

Parts List

1

8

Screw, 1/4–20 x 1˝

2

1

Bottle Stay

3

1

Bottle Support

4

1

Left Bracket

5

1

Right Bracket

6

1

Snap-On Clear Molding

 # 

Quantity

description

#1

#2

#3

#4

#5

#6

bottle

support

right end

bracket

screws

screws

left end

bracket

bottle
stay

clear
molding

(End)

Step 4 - Affix bottle labels

(not included) onto top 

of stay, as needed. Snap

clear molding onto bottle

stay.

Отзывы: