Installation, Operation and Parts Manual
EE-6435BWF
31
MAINTENANCE
Easy and low cost routine maintenance can ensure the lift work normally and safely. Following are requirements for routine maintenance.
Follow the below routine maintenance schedule with reference to the actual working condition and frequency of your lift.
LUBRICATE moving parts with lithium grease.
S/N
Components
Methods
Period
1
Control buttons
Check if control buttons work as "hold- to -run " and check if
they work as the function indicated.
Every day
2
Synchronization of the ascending
movement
Push the UP button, check and ensure the four mechanical
safety blocks give off sound simultaneously. Both runways shall
rise steadily without abnormal sounds.
Every day
3
Synchronization of mechanical
safety catch
Push the LOCK button, inspect and ensure the four mechanical
safety catches are fully engaged at the same height. Front the
rear side of the runway shall be of the same level.
Every day
4
Synchronization of the
descending movement
Push the DOWN button, inspect and ensure both runways can
descend smoothly.
Every day
5
Max height limit switch
Push the UP button and inspect and ensure the runways stop
rising at maximum lifting height.
Every week
6
Safety lowering limit switch
Push the DOWNI button. Inspect and ensure the runways stop
lowering at safety height (300mm) and then push DOWN II
button to have the platform fully lowered.
Every week
Содержание EE-6435BWF
Страница 33: ...Installation Operation and Parts Manual EE 6435BWF 33 Annex 1 Steel cable connection...
Страница 34: ...Installation Operation and Parts Manual EE 6435BWF 34 Annex 2 Electrical schemes and parts list...
Страница 35: ...Installation Operation and Parts Manual EE 6435BWF 35...
Страница 36: ...Installation Operation and Parts Manual EE 6435BWF 36...
Страница 37: ...Installation Operation and Parts Manual EE 6435BWF 37...
Страница 52: ...Installation Operation and Parts Manual EE 6435BWF 52...
Страница 53: ...Installation Operation and Parts Manual EE 6435BWF 53...