Maintenance
4-61
7
1
2
3
4
5
REPLACING THE CONVERTER
AVAILABILITY
• No mission capable
OPERATOR(S)
• 1 operator
TIME REQUIRED
• 1 hour
TOOL(S)
• 1 standard tool box
PRELIMINARY OPERATION(S)
• Set the “I/O” switch (see Plate 6.IV, item 2 or 9) on the primary convertor (item1 or 6)
to “O”.
• Remove the cable on the front panel (see Plate 6.VII item 7 or 8 and 9).
SHEET
E-8
Содержание CASSIDIAN IDR IDO 3G
Страница 5: ...DEFENDING WORLD SECURITY IDR IDO 3G Technical Manual TMO PS11209BENAB01 07 2012...
Страница 150: ...IDR IDO 3G_MC9_IDR IDO_FAV_PRES_01_01 3 1 2 4 5 7 6 8 9 10 11 15 14 13 12 18 17 16 Plate 6 II IDR IDO 3G FRONT PANEL...
Страница 152: ...1 7 2 3 4 5 IDR IDO 3G_MC9_IDR IDO_3 4 AR OUVERT_PRES_01_01 6 Plate 6 III IDR IDO 3G INTERNAL VIEW...
Страница 154: ...1 2 3 4 5 6 7 8 9 10 11 RIP IDO 3G_MC2_LED_ALIMENTATION_FAV_01_01 Plate 6 IV IDR IDO 3G PRIMARY MAINS OR DC CONVERTERS...
Страница 163: ......
Страница 164: ...MC2 RR APP 00033 02 02 EN...