background image

Owner’s Manual

Set-Up --Step 1: 

Place the shelter

frame only in the center of the setup area.  
With a partner on the opposite side of 
the frame, hold the two outer legs and 
lift slightly for ground clearance.  Take a 
few steps back and extend the frame to 
full arm’s length, approximately four
feet (Fig. A).

Step 2:  

 With a partner, hold the top and bottom of the truss

where it forms a diamond (Fig. B).  Lift slightly and slowly walk 
backward until the frame is fully extended (Fig. C).  Take care to 
avoid pinching your hands or fingers.  

Step 3:  

At each corner, place one hand on the 

top corner. While pushing down on the corner, 
lift the slider with your other hand until it locks 
into position (Fig. D).

Step 4:  

Place the fabric over the top 

of the frame.  Use the hook and loop 
straps to secure each corner of the 
cover to the upper portion of each leg 
(Fig. E).

Step 5:  

The adjustable legs offer 

multiple height positions.  Tilt one 
side of the shelter upward and 
extend a lower leg section until 
it clicks into place (Fig. F).  Repeat on 
the adjacent leg until all legs are 
extended.  When extending the legs, 
have a partner hold the frame stable 
and avoid having only two diagonal 
legs extended.

Parts included:

[1] assembled shelter frame

[1] storage bag

[1] fabric top 

 

A

 

Take Down --Step 1:  

Press 

the lock button and lower each 
leg completely (Fig. H).  

Step 2:  

At each corner, release the  

latch and pull the slider down slowly 
(Fig. I).  Be careful to not pinch your 
fingers.  Please make sure that all sliders 
are in an unlocked position below the 
button prior to attempting to collaspe the 
frame.  Closing the frame with any sliders 
in a locked position will cause damage 
and/or breakage.

Step 3:  

Hold the top of the center frame section and 

lift slightly, then slowly walk toward your partner as the 
frame folds in (Fig. J).   Keep walking until the frame is 
about half-way closed.   Be sure to avoid pinching your 
hands or fingers.   Hold outside legs and continue closing 
shelter as you walk towards your partner.  The completely 
folded shelter should stand up on it’s own.

Step 4:  

With the shelter standing, slide the bag over the 

shelter with the zippered end at the bottom (Fig. K).  Turn the 
shelter over gently and zipper shut.

B

C

E

D

H

I

K

J

[4] stakes

F

Please review the following instructions and make yourself familiar
with the parts and function of your E-Z UP® Instant Shelter®.

Отзывы: