background image

1- INTRODUCTION

First of all, thank you for choosing E.C.A. 

E.C.A. ARCEUS electric combi boilers are intended for meeting central heating and hot domestic

water requirement in an efficient, safe, and comfortable manner. ARCEUS electric combi boilers

can operate on 220-240 VAC (6/9/12 kW) and 380-415 VAC (6/9/12/15/18/24/27 kW) power.

MT model: 

It is intended for both central heating and hot domestic water requirement.

 

CH model: 

It is for central heating requirement only.

 

ST model: 

It is intended for both central heating and hot domestic water requirement. A boiler 

connection is required to meet the hot domestic water requirement.

 

This  manual  contains  assembly  and  operation  information  for  6/9/12/15/18/24/27  kW  ARCEUS 

electric combi  boilers.  The  manual  gives  detailed  information  on  the  technical  specifications  of 

the  device,  selection  of  device’s  installation  location,  water,  and  electrical  connections, 

maintenance  information,  and  detection  and  elimination  of  possible  faults.  Please  read  your 

manual  carefully  to  benefit  from  all  the  features of your device and use it smoothly for a long time.

 

Keep all documents provided with your device for future reference.

 

2-

WARRANTY AND SERVICE

• All repair and annual maintenance tasks must be performed by the E.C.A. authorized

services. The device is under the warranty of E.C.A authorized service for 3 years against all kinds

of malfunctions that may arise from material and workmanship, provided that the instructions and

warnings in the installation and operation manual are followed.

• The commissioning operation must be carried out by the E.C.A. authorized service. In order

for the warranty to be valid, you must have the warranty certificate provided with the manual

approved by the authorized  service  during  the  commissioning,  and  the  date  of  initial  start-up

must  be  written  on  the  warranty certificate.

• This E.C.A. product requires no repair under normal conditions of use. However, if you need

help with any issue, the after-sales customer service organization of E.C.A (EMAR) that is spread

throughout the entire country is at your disposal at any time. All maintenance-repair operations on

the device must be carried out by the E.C.A. authorized services for continued warranty

coverage.

• Information on all authorized service stations for the products and the places where spare

parts will be supplied can be found at "http://emas.com.tr/tr/bayi_servis/".

All authorized service station information can be accessed through the Service Information

System (SERBİS-"www.servis.gov.tr") established by the Ministry.

The lifetime for boiler devices as determined and announced by the Ministry of Commerce is 10

years.

3- SYMBOLS

The  following  symbols are placed  at  the necessary points in  the text  to  draw attention  to 
the  important  points  regarding  the  operation  and  installation  of  the  device

.

  The  meanings

of  the  symbols are described below.

Indicates situations that the user should not intervene, and are under the 

responsibility of the authorized service.

 

4

Содержание ARCEUS 12 MT

Страница 1: ...ARCEUS ELECTRIC COMBI BOILER ARCEUS 6 9 12 15 18 24 27 kW MT CH ST USER AND INSTALLATION MANUAL...

Страница 2: ......

Страница 3: ...rams 8 5 4 Detailed View Component List and Installation 12 6 PACKAGING 15 7 ASSEMBLY 15 7 1 Selection of Device s Assembly Location 15 7 2 Wall Mounting of the Device 16 8 CONNECTIONS 17 8 1 Water Pi...

Страница 4: ...se from material and workmanship provided that the instructions and warnings in the installation and operation manual are followed The commissioning operation must be carried out by the E C A authoriz...

Страница 5: ...on and within the operating pressure range of installation so that freeze protection would be activated The freeze protection remains active even if the device is in OFF closed position 4 4 Commission...

Страница 6: ...t breaker Anti freeze Protection for both Central Heating and Domestic Water Circuit Domestic Water Flow Control Pump Jamming Safety 3 Way Valve Jamming Safety Automatic Air Purge Expansion Tank 8 lit...

Страница 7: ...US 12 15 18 24 27 MT ARCEUS Monothermic Electric Combi Boiler ARCEUS 6 9 12 15 18 24 27 CH ARCEUS Central Heating Electric Combi Boiler ARCEUS 6 9 12 15 18 24 27 ST ARCEUS Central Boiler Aided Electri...

Страница 8: ...at CH Flow NTC CH Return NTC Boiler Tank NTC DHW Solar STB Water Pressure Sensor DHW Outlet Sensor Modbus Communication Cascade Board Wi Fi Board Connection Modulating Room Thermostat Programmable Tim...

Страница 9: ...w NTC CH Return NTC Boiler Tank NTC DHW Solar STB Water Pressure Sensor DHW Outlet Sensor Modbus Communication Cascade Board Wi Fi Board Connection Modulating Room Thermostat Programmable Timer Outdoo...

Страница 10: ...NTC CH Return NTC Boiler Tank NTC DHW Solar STB Water Pressure Sensor DHW Outlet Sensor Modbus Communication Cascade Board Wi Fi Board Connection Modulating Room Thermostat Programmable Timer Outdoor...

Страница 11: ...at CH Flow NTC CH Return NTC Boiler Tank NTC DHW Solar STB Water Pressure Sensor DHW Outlet Sensor Modbus Communication Cascade Board Wi Fi Board Connection Modulating Room Thermostat Programmable Tim...

Страница 12: ...ck 4 Neutral Terminal Block 5 Neutral Busbar 6 Cantactor 7 3 Way Valve 8 3 Bar Safety Valve 9 Electric Heaters 10 Main Heat Exchanger 11 Expansion Vessel 12 Drain Valve 13 Plate Heat Exchanger 14 Circ...

Страница 13: ...Control Board Figure 6 Control Panel Elements Figure 6 1 Control Board Rear Cover and Terminal Connections 13...

Страница 14: ...4 1 MT Model Installation Figurel 7 Monothermic Device Installation Scheme 5 4 2 CH Model Installation Figure 8 CH Device Installation Scheme DHW Outlet DHW Inlet CH Flow CH Flow CH Return CH Return 1...

Страница 15: ...dimensions of 735 x 345 x 490 HxWxD as supported by lower and upper styrofoams Boiler Exit CH Exit CH Return Boiler Return 7 1 Selection of Device s Assembly Location The location where the device can...

Страница 16: ...as bathtubs shower cabinets and must be assembled at least 50 cm away from these areas Since the outer surface temperature of the device does not exceed 85 C at maximum heating power no special protec...

Страница 17: ...3 4 outlet line hot b Domestic water pipe 1 2 outlet line hot c Domestic water pipe 1 2 inlet line cold d Central heating pipe 3 4 return line cold A suitable sized valve should be installed in the w...

Страница 18: ...e hot b Boiler outlet line 1 2 hot c Boiler return line 1 2 cold d Installation Filling line 1 2 e Central heating pipe 3 4 return line cold a b c d e Figure 14 ST boiler water connections 8 1 2 HCH M...

Страница 19: ...e device for overcurrent protection In case the circuit breaker trips call an authorized service 8 2 Electrical Connection Your combi boiler must be connected to a grounded power line that can supply...

Страница 20: ...9 CH ST Single phase 3x10 39 B40 1P Three phase 5x2 5 13 B15 3P ARCEUS 12 MT CH ST Single phase 3x10 52 B63 1P Three phase 5x4 17 B20 3P ARCEUS 15 MT CH ST Three phase 5x6 22 B25 3P ARCEUS 18 MT CH S...

Страница 21: ...hermostat T6360 7006907804 E C A Smart Combi Boiler Kit 7006907531 E C A Digital Room Thermostat Cordless Programmable CM727 7006902046 Poly 100 W Room Thermostat 7006903001 E C A Digital Room Thermos...

Страница 22: ...er comes out This is done for all radiators The pressure is rechecked via the LCD screen The filling valve is opened and the pressure is allowed to reach 1 5 2 bar Whether there is air in the central...

Страница 23: ...ith the central heating circuit temperature increase button the temperature of the heating water in the central heating circuit can be increased to 80 C Domestic Water Temperature Decrease Button With...

Страница 24: ...ssword value at parameter menu entry Reduces parameter value Indicates information value Indicates error history value Figure 18 Control Panel Button Configuration 10 2 1 Button Functions K5 K6 K1 K3...

Страница 25: ...andby Mode Off Mode It is the mode in which the device can be set to standby mode In this mode central heating and domestic water heating demands cannot be met 10 3 2 Summer Mode In this mode the devi...

Страница 26: ...is mode is activated are listed below When the device is powered for the first time or after the power goes out and comes back After a reset process following the overheating error After a high water...

Страница 27: ...ture reaches to 15 C Below conditions must be provided and controlled by the customer for anti freze protection to work properly Power supply of the device must bu connected Radiator valves must be op...

Страница 28: ...d by pressing the RESET button L43 Water Pressure Sensor Error This error is displayed if the pressure sensor is short or open circuit or damaged When this error is cleared normal operation begins L47...

Страница 29: ...hibitor Sentinel X400 etc should be added to the installation water 12 3 Cleaning of Combi Boiler Keep the outer casing of the combi boiler clean by wiping it with a soft damp cloth Do not use strong...

Страница 30: ...1 3x10 1 3x10 Power Cord CrossSec on mm 5x6 5x6 5x6 5x10 3 5x2 5 3 5x2 5 3 5x4 Protec on Class IPX4D IPX4D IPX4D IPX4D IPX4D IPX4D IPX4D Sound Level dB 42 42 38 38 38 38 38 Net Weight kg 26 26 27 27 2...

Страница 31: ...odel identifier Space Heating Temperature application Medium Efficiency Class Water Heating Load Profile Rated heat output Prated ARCEUS Combi ERP Units CH ST Model Supplier s name or trademark E C A...

Страница 32: ...8 U O U n n n n n n nmn n n 9 8 1 6 2 00 1 4 0 3 1 6 5 0 2 9 8 6 6 7 00 2 1 0 3 2 6 2 0 1 4 8aYU8Rna 8 nJ 8cLUFn U Fln E M U ln MUn n n 0 n Bnc8Wn 9cLUFnMan8 Yi n nga n n 81U U8 U BU U U U E U UP F 4...

Страница 33: ...33...

Страница 34: ...vl8 rvl X7 7 Lv Xh X EZ4T e i 4lz rlh7 l Y 4 h vR I4Y h5 lh4 Xh _ 7 Xh Xd7XhR VY J4Y h4 Y h4 7 0 Q H4 mv 4T T l Xh T 7Y X Xlh e h9 T 7Xe h Ylk hS kFc 4T v 4 vX X4 T lB W v T hS qvR J4X h4 lB T 4lf1 h...

Страница 35: ...erial Number Submit Date and Location Maximum Repair Time 20 Work Days Warranty Time 3 Years AUTHORIZED SERVICE Title Address Tel Fax Assembly Date Date Signature and Seal FREE INITIAL START UP COUPON...

Страница 36: ...PRODUCTION Organize Sanayi Bolgesi 3 Kisim Mustafa Kemal Boulevard No 13 45030 MANISA Tel 90 236 213 00 21 Fax 90 236 213 08 59 email emas emas com tr www emas com tr 7006910085 2 0...

Отзывы: