background image

10.Visits by the service personnel would be charged to
customer if;

a)

any failure caused by contaminated water in the system

b)

the boiler is not accessible or an engineer cannot gain

access to the property

c)

a fault cannot be found.

d)

Benchmark commissioning sheet or equivalent control

document is not available.

e)

Failure to cancel an agreed appointment prior to our

engineers visit at least before

 

12 noon on the

 

day preceding

the agreed appointment in order to arrange an alternative
date.

f)

The boiler is outside the period of warranty or any

warranty ending condition mentioned in point 9

 

occurrs.

g)

the fault is not product related, or alternatively if the fault

is due to an installation error or because the

 

system requires

cleansing. Our engineer will advise you of this on the day
and we

 

reserve the right to

 

charge an inspection fee.

11.The customer is responsible for the following points during
visits by the service personnel;

a.

The customer is has to be available to be contacted 30

minutes prior to the appointment. If not, our

 

engineer will

proceed to attend the appointment.

b.

You are responsible for providing adequate parking for our

engineer.

c.

Our engineers are entitled to work in a smoke free

environment and as such, you are required to

 

ensure that

the engineer is not exposed to active smoking whilst he is
within the property.

d.

It is your responsibility to ensure that pets are away from

the area where the engineer needs to work

 

e.We reserve the

right to cancel an appointment and to retain an inspection fee
should legal parking not

 

be

 

provided, or if we are unable to

obtain clear and safe access

 

to the property or product, or if

we have

 

reason to believe that the health and safety of our

engineer cannot be guaranteed.

f.If chargable works are required, we will not service until
payment is made.

g.We  reserve  the  right  to  not  fulfill  an  appointment,  should
the necessary spares

 

be unavailable, if the

 

product is subject

to recall or if the product has become obsolete and removed
from our current product

 

list.

h.

For all engineer visits out of warranty we will normally

ask for payment details (credit/debit card) prior

 

to

 

booking an

engineer appointment. These details will be used to reserve
our charge on your account.

 

Once the engineer appointment

is concluded this charge will then be debited from your
account.

i.

You are required to provide telephone contact numbers to

enable us to contact

 

you in the course of

 

arranging and

fulfilling your appointment. In the course of arranging and
fulfilling your appointment we

 

may choose to contact you via

phone, text, fax or e-mail.

Charges

x

Servicing and Commissioning appointments are 

charged at a fixed price inclusive of VAT, with the price

 

being dependant on the product.

 

Spare Parts 

Guarantee

x

Any parts fitted under one of the chargeable call 

types above are guaranteed for one calendar year

 

against

 

defective workmanship and defective 

components.

x

If we fit replacement parts or replace a boiler it will 

not extend the period of the warranty. All replaced

 

parts

 

or boilers will become the property of E.C.A.

x

If your service visit was done on a fixed charge 

basis and it becomes evident, within 30 days of the

 

original

 

appointment, that your product has not been 

successfully repaired then we will return to repair

 

the 

product free

 

of charge, but subject to the same terms 

and conditions. If however, a new fault has

 

developed since the original

 

appointment, then 

we reserve the right to charge for the second

 

appointment in line with our terms andconditions.
If you smell gas or are worried about gas safety, you 
can call the National Gas

 

Emergency Service free

 

on 

0800 111 999 at any time, day or night.

This boiler warranty is offered in addition to the rights 
provided to a consumer by law. Details of these 
rights can be obtained from a Trading Standards 
Authority or a Citizen Advice Bureau.

We reserve the right to update or amend these Terms 
and Conditions at any time and its decision in relation 
towarranty claims shall be final.

Your guarantee is provided to you by 

ARD London 

(registered in England with company 44 
800 640 9988 or +44 20 3978 1212) of 

Guarantor 

 

ARD London , Adres: 15 / a Raven Road

 

London 

E18 1HB

Data Protection

Your details will be kept safe and secure, only used by 
us  or  those  who  partner  with  us,  and  will  not  be 
shared  with  anyone  else.  By  submitting  your  details, 
you are telling us that you are okay with this and that 
you agree with our privacy notice. You can of course, 
change  your  mind  at  any  time.  If  you  have  given  us 
permission,  your  details  may  also  be  used  by  us  or 
third parties for other marketing purposes. We and the 
third  parties  (if  applicable)  may  contact  you  by  mail, 
telephone or email. If you no longer want your data to 
be  used  by  third  parties  or  by  us  for  marketing 
purposes, please contact us.

19

Содержание 8116450010

Страница 1: ...3527 86 35 0 0 67 3527 86 35 0 21 16 1 2 5 23 5 7 1 167RUCTIONS ...

Страница 2: ...ombi Boiler in Terms of Safety and Energy Consumption 3 2 Clogging in Installation 3 3 Cleaning of Boiler 3 4 Boiler Features 3 5 Additional Recommendations by ECA to Customer To Have High Heating Performance 4 4 TECHNICAL DATA 5 5 ERP TECHNICAL DATA 5 1 PACKAGE LABEL CALCULATIONS 10 6 6 USING THE BOILER 13 6 1 Switching Off the Boiler 13 7 7 CONTROL PANEL 13 7 1 Functions of Buttons 13 7 2 LCD Sc...

Страница 3: ...nstalled in accordance with national and local requirements gas safety regulations relevant standarts and this manual by gas safe engineer 9 The boiler must be mounted against a closed wall 9 The boiler can not be positioned having direct contact to steam detergent or gases 9 Any change of flue position must not be made without consulting gas safe engineer 9 Sunlight can cause color change on the ...

Страница 4: ...t centralheating co uk or installersfirst co uk for more information PRODUCT NAME PRODUCT CODE GC NUMBER PROTEUS PREMIX 14 HM NG ERP UK 8116941010 47 814 30 PROTEUS PREMIX 20 HM NG ERP UK 8116944010 47 814 29 PROTEUS PREMIX 24 HM NG ERP UK 8116450010 47 814 01 PROTEUS PREMIX 28 HM NG ERP UK 8116451010 47 814 02 PROTEUS PREMIX 30 HM NG ERP UK 8116452010 47 814 03 PROTEUS PREMIX 35 HM NG ERP UK 8116...

Страница 5: ...tial start up of the boiler Instructions are given below 9 Check Operating Instructions Installation and Maintenance Instructions and follow instructions before installation 9 Carry out installation in compliance with the prevailing legislation and standarts 9 Be sure that the system is flushed and inhibitor added 9 Only gas safe engineer must operate the boiler 9 Explain the user about installati...

Страница 6: ... unauthorized service or staff 3 4 Boiler Features Control panel is ergonomic and easy to use The Proteus Premix condensing boiler with elegant plastic control panel and advanced LCD screen provides ease of use and service On a LCD display with black instrument panel you can see the operating state icons heating circuit and operating water adjustment values the fault failure codes and the heating ...

Страница 7: ...5 Seasonal Space Heating Energy Efficiency 91 11 91 4 92 2 92 4 92 92 9 Water Heating Energy Efficiency 83 6 83 6 83 6 83 9 82 8 82 8 Sound Power Level db A 49 49 49 49 49 49 Efficiency at Rated Heat Output At High Temperature Regime ƞ4 87 9 87 9 87 9 87 9 87 9 87 9 Efficiency at 30 of rated Output At Low Temperature Regime ƞ1 97 97 97 2 97 4 97 97 9 At Full Load elmax kW 0 028 0 035 0 04 0 051 0 ...

Страница 8: ...D Expansion Vessel lt 8 Weight Net kg 28 5 28 5 28 5 30 30 32 Weight Net only for HCH model kg 22 5 22 5 22 5 24 24 26 Dimesions HxWxD mm 678 410 288 Flue Lenghts C13 60 100 Max m 10 10 10 10 10 10 C13 80 125 Max m 20 20 20 20 20 20 C33 60 100 Max m 10 10 10 10 10 10 C33 80 125 Max m 20 20 20 20 20 20 C43 60 100 Max m 10 10 10 10 10 10 C53 60 100 Max m 10 10 10 10 10 10 C83 80 80 Max m 28 28 28 28...

Страница 9: ...B 49 Specific precautions for assembly installation and maintanence All specific precautions for installation assembly and maintanence are described in the installation and service manual Proteus Premix Boiler ERP Units HCH 67 MODEL Supplier s name or trademark E C A Proteus Proteus Proteus Proteus Proteus Proteus Supplier s model identifier Premix Premix Premix Premix Premix Premix 14 20 24 28 30...

Страница 10: ...ion from fiche of solar device III The value of the mathematical expression 294 11 Prated whereby Prated is related to the preferential space heater IV The value of the mathematical expression 115 11 Prated whereby Prated is related to the preferential space heater 1 If tank rating is above A use 0 95 1 T Class I 1 Class II 2 Class III 1 5 Class IV 2 Class V 3 Class VI 4 Class VII 3 5 Class VIII 5...

Страница 11: ...r in this fiche may not correspond to its actual energy efficiency once installed in a building as this efficiency is influenced by further factors such as heat loss in the distribution system and the dimensioning of the products in relation to building size and characteristics Package Fiche Combination Heaters Boilers or Heat Pumps Water heating energy efficiency of combination heater Declared lo...

Страница 12: ...e dimensioning of the products in relation to building size and characteristics I The value of the water heating energy efficiency of the combination heater expressed in II The value of the mathematical expression 220 Qref Qnonsol where Qref is taken from Regulation EU 811 2013 Annex VII Table15 and Qnonsol from the product fiche of the solar device for the declared load profile M L XL or XXL of t...

Страница 13: ... Comfort mode Once the Reset button is pressed when operating in Comfort mode the boiler will switch to Eco mode Then when Reset button is pressed again the unit will switch to Comfort mode C Domestic Hot Water Increase Temperature Button The temperature of the domestic water can be increased up to 65 C thanks to the domestic water temperature increase button D Central Heating Water Increase Tempe...

Страница 14: ...domestic hot water is heating request the tap symbol flashes 1 time sec In this mode the domestic hot water temperature can be adjusted between 30 65 C 7 3 5 Comfort Mode The standard operating mode of the boiler is Comfort mode By pressing the Reset button Eco Comfort modes can be switched When Comfort mode is active Comfort icon is displayed on the LCD screen Comfort mode is only for radiator he...

Страница 15: ... is still present or persists after reset notify gas safe engineer 1 Press reset button 2 If the error is still present or persists after reset notify gas safe engineer 1 Check that water valves of boiler installation are open 2 If the combi boiler triggers this error in winter mode check that at least 1 radiator is open 3 Press reset button 4 If the error is still present or persists after reset ...

Страница 16: ...when the temperature of the flue gas exceeds 95 o C F07 1 Notify gas safe engineer F13 Repeated Reset Fault Pressing of Reset button more than 5 times in an hour 1 Notify gas safe engineer F25 Electronic Card Fault Electronic Card Firmware Fault 1 Notify gas safe engineer F34 Low Supply voltage It occurs when the supply voltage falls below 170V 1 Notify gas safe engineer 1 Press reset button 2 If ...

Страница 17: ...lue gas The flue gas temperature sensor is in short or open circuit state F53 1 Notify gas safe engineer Flue Gas Lock Out at High Temperature If it gives an error F07 twice in 1 month this error will occur F58 1 Notify gas safe engineer F81 Temperature sensor deviation test delay Temperature sensors might be defective 1 Notify gas safe engineer Table 1 Error Code Table 1 Check water pressure in h...

Страница 18: ...any third party who undertakes any work carried on the product or fits parts unless approval is given by the means mentioned in point 5 such work in advance of it being carried out 7 The boiler has to be installed at an accessible area where Engineers can perform servicing without health and safety risk 8 Cupboard installations must provide minimum working clearances as detailed in the installatio...

Страница 19: ...then be debited from your account i You are required to provide telephone contact numbers to enable us to contact you in the course of arranging and fulfilling your appointment In the course of arranging and fulfilling your appointment we may choose to contact you via phone text fax or e mail Charges xServicing and Commissioning appointments are charged at a fixed price inclusive of VAT with the p...

Страница 20: ...gesi 3 Kısım Mustafa Kemal Bulvarı No 13 45030 MANİSA 90 236 213 00 21 SALES TECHNICAL SUPPORT Call Center Tel 44 800 640 9988 Office Tel 44 203 978 1212 FWඈYDWඈQJ RXU TXDUDQWHH ඈV TXඈFN DQG VඈPSOH EXW UHDOO ඈPSRUWDQW 5HJඈVWHU DW www ecaboilers co uk warranty registration complate and return in the envelope provided 45 FRGH VFDQ PH ...

Отзывы: