
QEM13
www.powercommander.com
2007-2013 Suzuki GSXR1000 QEM - 3
4th hole from end
5th hole from end
•
For the unit to function correctly the wires from
the QEM must be wired correctly to the PCV.
The BLUE wire goes to pin #4 and the GREEN
wire goes to pin #5
•
To insert the wires into the PCV strip back about 10mm of the insulation from the wire. Using a paperclip (or similar) poke the hole of the
PCV to pierce the foam. It may also be helpful to tin the wire with solder for a secure connection.
•
Remove the rubber seal on the back side of the PCV. Loosen the set screw of the corresponding hole and insert the wire into the PCV.
Tighten the set screw. Pull on the wire to ensure it does not pull out.
•
Open the PCV control center software. Go to Power Commander Tools - Configure - Features, Enables, and Input Selections. Click on the
box to enable the Quickshifter feature. Make sure the Switch Input setting is set to Switch Input #2. Click the Configuration button for the
Quickshifter feature. You can adjust kill times per gear by going to Mode - Gear Dependent. For this to function you must have the speed
input connected to the PCV and gear position calibrated correctly (see PCV install guide).
•
Your PCV firmware version needs to be at least 0.1.8.8. to use this accessory. Check by going to View - Device Info. It is recommended to
update your PCV software and firmware versions to the latest versions posted on our website. Go to Power Commander Tools - Update
Firmware. The latest firmware can be found at http://www.powercommander.com
•
This QEM can only be used with a normally open circuit shift sensor/switch.