PowerDepot H5B series User Manual
11
Step 2
Mechanical
installation
1. bracket check
2.Equipment installation
Step3
Electrical
installation
1. Connect the grounding cable
2 Electrical installation
3.Connect inverter
4.Communication interface connection
3.2.1 Floor installation
When the battery system is placed directly on the ground, a fixed support must be used to fix the
top of the battery box on the wall.
1
.
Use
the
positioning
cardboard
(provided in accessory package) and
mark the screw hole positions on the
wall, as shown four holes in the
picture on the left.
2
.
The bottom of the board must be in
horizontal touch with the ground
while marking the holes.
3
.
According to the marked position, use
an electric drill to drill 4 holes with a
diameter of 10mm on the wall for
installing M6 expansion bolts. The
depth of the holes should be greater
than 70mm.