3.1.5 Engineering coordination
Attention should be paid to the following items before construction:
⚫
Power line specification.
The power line specification shall meet the requirements of maximum discharge
current for each product
.
⚫
Mounting space and bearing capacity.
Make sure that the battery has enough room to install, and that the battery rack and
bracket have enough load capacity.
⚫
Wiring.
Make sure the power line and ground wire are reasonable. Not easy to short-circuit,
water and corrosion.