3.
Open the lever and drain off all water.
4.
Close the cover again.
8.10.7
Measures prior to extended shut-down period
8.10.7.1
Measures before shutting down
If the machine is shut down for a longer period of time, e.g. winter
season, the following work must be carried out:
1.
Clean the machine thoroughly.
2.
After shutting down store the machine under cover in a dry
and well ventilated room.
3.
Spray a thin oil film onto to all lever joints and bearing points
without lubrication.
4.
Repair damaged paint; preserve bare areas thoroughly with
anti-corrosive agent.
5.
Clean the water separator.
6.
Fill the fuel tank with diesel fuel to prevent the formation of
condensation water in the tank.
7.
Change engine oil and oil filter.
8.
Change the fuel filter.
9.
Protect the cooled down engine against dust and moisture.
8.10.7.2
Battery service during prolonged machine downtimes
WARNING!
Danger of injury caused by exploding gas mix-
ture!
–
Remove the plugs before starting to recharge
the battery.
–
Ensure adequate ventilation.
–
Smoking and open fire is prohibited!
–
Do not lay any tools or other metal objects on
the battery.
–
Do not wear jewellery (watch, bracelets, etc.)
when working on the battery.
–
Wear your personal protective equipment (pro-
tective gloves, protective clothing, goggles).
B-016-0043
Fig. 128
Maintenance – As required
DTR75D
107
Содержание DTR75D
Страница 6: ...10 Disposal 119 10 1 Final shut down of machine 120 Table of contents DTR75D 6 ...
Страница 7: ...1 Introduction Introduction DTR75D 7 ...
Страница 11: ...2 Technical data Technical data DTR75D 11 ...
Страница 15: ...3 Concerning your safety Concerning your safety DTR75D 15 ...
Страница 42: ...Concerning your safety Signage DTR75D 42 ...
Страница 43: ...4 Indicators and control elements Indicators and control elements DTR75D 43 ...
Страница 49: ...4 3 Engine 4 3 1 Recoil starter B 016 0064 Fig 37 Indicators and control elements Engine DTR75D 49 ...
Страница 50: ...Indicators and control elements Engine DTR75D 50 ...
Страница 51: ...5 Checks prior to start up Checks prior to start up DTR75D 51 ...
Страница 61: ...6 Operation Operation DTR75D 61 ...
Страница 75: ...7 Loading transporting the machine Loading transporting the machine DTR75D 75 ...
Страница 80: ...Loading transporting the machine After transportation DTR75D 80 ...
Страница 81: ...8 Maintenance Maintenance DTR75D 81 ...
Страница 109: ...9 Troubleshooting Troubleshooting DTR75D 109 ...
Страница 118: ...Troubleshooting Engine malfunctions DTR75D 118 ...
Страница 119: ...10 Disposal Disposal DTR75D 119 ...
Страница 121: ......
Страница 122: ......