2.1 Noise and vibration data
The following noise and vibration data were determined in accord-
ance with the following guidelines under equipment specific condi-
tions and by using harmonized standards:
n
EU Machine Directive edition 2006/42/EU
n
Noise Emission Directive 2000/14/EU, Noise Protection Direc-
tive 2003/10/EU
n
Vibration Protection Directive 2002/44/EU
During operation these values may vary because of the prevailing
operating conditions.
2.1.1 Noise data
L
pA
= 93 dB(A), determined acc. to ISO 11201 and EN 500.
WARNING!
Loss of hearing caused by too high noise bur-
dens!
–
Wear your personal protective equipment (ear
protection).
L
WA
= 108 dB(A), determined acc. to ISO 3744 and EN 500.
2.1.2 Vibration data
Vector total of the weighted effective acceleration in three orthog-
onal directions:
Total vibration value a
hv
= 4.3 m/s
2
on crushed rock determined
acc. to ISO 5349 and EN 500.
Associated uncertainty K
= 0.4 m/s
2
, determined acc. to EN
12096.
Observe the daily vibration load (work safety acc. to 2002/44/EC).
Vector total of the weighted effective acceleration in three orthog-
onal directions:
Total vibration value a
hv
£
2.5 m/s
2
on crushed rock determined
acc. to ISO 5349 and EN 500.
Associated uncertainty K
= 0.1 m/s
2
, determined acc. to EN
12096.
Observe the daily vibration load (work safety acc. to 2002/44/EC).
Sound pressure level at the opera-
tor's stand
Guaranteed sound power level
Hand-arm vibration
Hand-arm vibration with comfort
guide handle (optional equipment)
Technical data – Noise and vibration data
DFP12D
14
Содержание DFP12D
Страница 2: ...2...
Страница 6: ...Table of contents DFP12D 6...
Страница 7: ...1 Introduction Introduction DFP12D 7...
Страница 11: ...2 Technical data Technical data DFP12D 11...
Страница 15: ...3 Concerning your safety Concerning your safety DFP12D 15...
Страница 35: ...Brief operating instructions Fig 15 Concerning your safety Signage DFP12D 35...
Страница 37: ...4 Indicators and control elements Indicators and control elements DFP12D 37...
Страница 42: ...Indicators and control elements Transport wheels DFP12D 42...
Страница 43: ...5 Checks prior to start up Checks prior to start up DFP12D 43...
Страница 50: ...Checks prior to start up Checking the water level topping up DFP12D 50...
Страница 51: ...6 Operation Operation DFP12D 51...
Страница 59: ...7 Loading transporting the machine Loading transporting the machine DFP12D 59...
Страница 64: ...Loading transporting the machine Transport wheels DFP12D 64...
Страница 65: ...8 Maintenance Maintenance DFP12D 65...
Страница 90: ...Maintenance As required DFP12D 90...
Страница 91: ...9 Troubleshooting Troubleshooting DFP12D 91...
Страница 95: ...10 Disposal Disposal DFP12D 95...
Страница 97: ......
Страница 98: ......