5.
Close the flap.
6.2.2 Checking the remote control
Protective equipment:
n
Working clothes
n
Safety shoes
n
Protective gloves
n
Hearing protection
Prerequisites:
n
Main battery switch is switched on
n
Emergency stop switch is unlocked
1.
2.
If several machines are used at the same time, compare the
system numbers on the remote control and receiver.
ð
The system numbers on both devices must match.
3.
Exchange the remote control, if necessary.
4.
Switch the toggle switch for engine speed to "MIN” position.
B-720-0071
Fig. 68
Preparations
MAX
MIN
B-720-0074
Fig. 69
Operation – Start-up procedure
D.ONE
75
Содержание D.ONE
Страница 2: ...2...
Страница 7: ...1 Introduction Introduction D ONE 7...
Страница 11: ...2 Technical data Technical data D ONE 11...
Страница 16: ...Technical data Noise data D ONE 16...
Страница 17: ...3 Concerning your safety Concerning your safety D ONE 17...
Страница 50: ...Concerning your safety Signage D ONE 50...
Страница 51: ...4 Indicators and control elements Indicators and control elements D ONE 51...
Страница 60: ...Indicators and control elements Remote control D ONE 60...
Страница 61: ...5 Checks prior to start up Checks prior to start up D ONE 61...
Страница 69: ...6 Operation Operation D ONE 69...
Страница 95: ...7 Loading transporting the machine Loading transporting the machine D ONE 95...
Страница 101: ...8 Maintenance Maintenance D ONE 101...
Страница 142: ...Maintenance As required D ONE 142...
Страница 143: ...9 Setting up refitting Setting up refitting D ONE 143...
Страница 148: ...Setting up refitting Teaching the BOSS safety field system D ONE 148...
Страница 149: ...10 Troubleshooting Troubleshooting D ONE 149...
Страница 167: ...11 Disposal Disposal D ONE 167...
Страница 169: ...12 Appendix Appendix D ONE 169...
Страница 189: ......
Страница 190: ......