UVCS LED Light-Curing Conveyor Systems User Guide
Conveyor System Setup
Conveyor Setup
1.
If purchased, uncrate and assemble the optional Conveyor
Mounting Cart prior to unpacking the Conveyor.
2.
Remove the protective coverings from the Conveyor. Place
the Conveyor on the Conveyor Mounting Cart or on a
convenient work surface. Install the Exhaust Ventilation
Stack on the Blower Motor’s Outlet Flange. Secure the
Exhaust Ventilation Stack with the 3 fasteners provided.
3.
Unpack the LED Flood System(s). Each Flood System includes
an LED Array, Power Supply, Power Cord, and Interconnect
Cables. There may be one or two LED Array systems inside
the crate depending on the conveyor system ordered.
Figure 2. Exhaust Ventilation
Stack
Mounting the LED Flood Array(s)
Up to four LED Arrays can be mounted onto your conveyor. Please reference the quick start instructions
included with your Conveyor Kit for complete set up instructions.
Interconnect Cables
Attach and fasten the 37-Pin Interconnect Cable from the back panel of the Power Supply to the top of the
LED Flood Array.
Figure 3. Interconnect Cable to Power
Supply
Figure 4. Interconnect Cable to LED Flood
Array
The LED Arrays may be controlled using the Activation Switch on the front face of the Conveyor to toggle the
LED Array on and off. This allows the LED to remain on for as long as needed.