![dymax Tridak 1001 Скачать руководство пользователя страница 14](http://html.mh-extra.com/html/dymax/tridak-1001/tridak-1001_user-manual_2546038014.webp)
14
Tridak® Model 1001 Syringe Filling System User Guide
Figure 9. Fluid Path Installation
NOTE: Follow the same assembly and replacement for the following filling configurations:
T15225
TUBE ASSEMBLY, LUER FEMALE
Pressurizing the System
NOTE:
Before operating the machine at the beginning of each run, check that all tubes, covers, guards, and
safety devices are properly installed for operation.
The system is energized when a compressed air supply is connected to the System Pressure Inlet.
WARNING!
Do not exceed 90 psi system pressure.
The following steps must be completed in order to safely pressurize the system. If these steps are not followed
correctly, it is possible to create a situation that could result in a material spill through the Luer Tip.
1.
Ensure that the Fluid Path is correctly installed in the Luer Support and the Tube Support.
2.
Check that the Luer Clamp and the Tube Support are clamped fully.
Fluid Path / Tubing
Valve Body
Tube Support
Over-Pinch Adjust
ASSEMBLED VIEW
Suck-Back Adjust
EXPLODED VIEW