- 2 -
Add dimension Y and 1/8" (3 mm). Using that dimension,
mark a line on the pipe measuring from the hub side.
Cut off the pipe at the line with a pipe cutter.
Bevel the sharp edges as shown to assure a smooth
insertion into the pipe hubs in the wall.
7302409-100 (2/2020)
5
6
+
1/8
"
+(3 mm)
Y
Y
Seal gap around bowl with waterproof sealant.
10
9
Install both seals into the pipes in the wall. Lubricate seals
with appropriate rubber seal lubricant.
Remove protective sleeves from threaded mounting rods.
Install rods with a protruding length of 1-3/8" (35 mm) from
the finished wall. Then install the threaded nuts leaving
approximately 3/8" (10 mm) of the threaded rod exposed.
Also insure the concave portion of the nut is facing down!
Install both pipes into the hubs in the wall.
7
8
3/8"
(10 mm)
Ensure each of the pre-installed 4 fingered plastic mounts
are securely mounted into each mounting hole of the toilet.
Place bowl onto female threaded nuts and carefully insert
bowl so the threaded female nuts go into the plastic finger
housings mounted in the toilet. Once toilet is fully mounted
into the female threaded nuts, turn the hex allen rod insert-
ed into the plastic housing clockwise to tighten toilet into
finished wall.
Female
Thread Nut
Concave
4 Fingered
plastic
mount
Hex allen
rod
Hex allen
handle