![Durr Dental XR 24 Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/durr-dental/xr-24/xr-24_installation-and-operating-instructions-manual_2542952009.webp)
9
2
4
3
1
2
3
4
5
6
7
8
7
9
10
11
12
8. Preliminary measures
The following measures need only be
taken when the Regeneration Unit is
subsequently being connected to a X-ray
developer.
• Remove mains plug (1) from socket
• Lift cover (2)
• Drain any chemicals from the X-ray
developer
• Open the green catch (3) on the film intake
roller set (6)
• Remove roller set (6)
• Open the green catch (3) and the clips (4)
of the dryer roller set (5)
• Swing the dryer roller set (5) towards the
rear and lift out
• Rinse the baths with warm water
• Close the water tap
• Remove the cover necessary for working
8.1 Remove front cover
• Unscrew the two quick-release screws
(11) from the front cover panel (12)
• Unscrew the three Philip’s screws (7) and
remove the front cover panel (12)
8.2 Remove rear cover
• Unscrew the three Philip’s screws (7) and
remove the rear cover panel (9)
8.3 Remove side covers
• Remove front (12) and rear panels (9), lift
the side panels (10) upwards to remove