7
6. FUNCTION PRINCIPLE
E
Developer bath
F
Fixer bath
W
Water bath
1
Processing time regulator
2
Unit switch ON/OFF
3
Film transporter
4
Heater
5
Transporter drive
6
Perforated collector
1
2
3
4
5
6
7. FUNCTION DESCRIPTION
Switch on main switch (2).
Heater for Developer/Fixer baths is started
(8 min/°C to 25°C bath temperature).
Switch on regulator (1) for the film
transport and set the processing time
(2-6 min.).
The films are carried via the film transporter
through the Developer-/Fixer baths. The
processed film remains in the perforated
collector and should be taken out after
approx. 5 mins.
Содержание XR 04
Страница 1: ...INSTALLATION AND OPERATING INSTRUCTIONS X RAY FILM PROCESSOR DÜRR XR 04 ...
Страница 2: ...2 ...