![Durr Dental XR 04 Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/durr-dental/xr-04/xr-04_installation-and-operating-instructions-manual_2542881011.webp)
11
8
W
E
F
9
9.3 Removing heater
Only necessary with table-top model,
otherwise the Developer-/Fixer
containers cannot be removed.
Lift up Heater (4) and hang on frame.
9.4 Disposing of used chemicals
• Remove by rotating the 3 containers
Developer (E)/Fixer (F)/Water (W) and very
carefully take off downwards.
• Empty out chemical and water containers.
• Dispose of chemicals.
• Rince containers with warm water and clean
thoroughly.
9.5 Mixing new chemicals
Fill containers only up to the
markings.
Danger of "spillage" during
insertion of containers.
• Pour developer up to black marking in
container (E) and then fill up with fresh water
to the upper marking. Insert container and
rotate to fasten.
• Pour fixer up to the red marking in container
(F) and then fill up with fresh water to the
upper marking.
Insert container and rotate to fasten.
• Fill container (W) with white markings up to
the upper mark with fresh water.
Insert container and rotate to fasten.
Содержание XR 04
Страница 1: ...INSTALLATION AND OPERATING INSTRUCTIONS X RAY FILM PROCESSOR DÜRR XR 04 ...
Страница 2: ...2 ...