
Operation
20
Operating Instructions 911-211-10 - 00.0 - 10/2020
4.5
Threading the needle thread
Fig. 6: Threading the needle thread (1)
WARNING
Risk of injury from sharp and moving parts!
Puncture or crushing possible.
Switch off the machine before threading the needle
thread.
(1)
- Thread lever
(2)
- Needle thread regulator
(3)
- Guide
(4)
- Guide
(5)
- Needle thread monitor
(6)
- Needle thread clamp (optional)
(7)
- Guide
(8)
- Guide
(9)
- Needle eye
(10) - Thread tensioning spring
(11) - Deflection
(12) - Guide
(13) - Guide
(14) - Tension
(15) - Tension
(16) - Guide
(17) - Hose guide
①
④
⑤
⑥
⑦
⑧
⑨
⑩
⑪
⑫
⑬
⑭
⑮
⑯
⑰
③
②
Содержание 911-211-10
Страница 1: ...911 211 10 Operating Instructions...
Страница 6: ...Table of Contents 4 Operating Instructions 911 211 10 00 0 10 2020...
Страница 10: ...About these instructions 8 Operating Instructions 911 211 10 00 0 10 2020...
Страница 34: ...Operation 32 Operating Instructions 911 211 10 00 0 10 2020...
Страница 88: ...Programming 86 Operating Instructions 911 211 10 00 0 10 2020...
Страница 108: ...Setup 106 Operating Instructions 911 211 10 00 0 10 2020...
Страница 110: ...Decommissioning 108 Operating Instructions 911 211 10 00 0 10 2020...
Страница 112: ...Disposal 110 Operating Instructions 911 211 10 00 0 10 2020...
Страница 133: ......