Setup
Operating Instructions 610-10/630-10 - 01.0 - 01/2021
105
3. Screw all plugs to the connections.
7.7.2
Establishing equipotential bonding
Important
Before putting the machine into operation, you must establish
equipotential bonding in all necessary places.
To establish equipotential bonding:
1. Establish equipotential bonding as specified in the wiring
diagram (
Appendix,
).
7.8
Pneumatic connection
The pneumatic system of the machine and of the additional equip-
ment must be supplied with dry and oil-free compressed air.
The supply pressure must lie between 8 and 10 bar.
NOTICE
Property damage from oily compressed air!
Oil particles in the compressed air can cause malfunctions of
the machine and soil the sewing material.
Ensure that no oil particles enter the compressed air supply.
NOTICE
Property damage from incorrect system pressure!
Incorrect system pressure can result in damage to the
machine.
Ensure that the machine is only used when the system
pressure is set correctly.
Содержание 610-10
Страница 1: ...610 10 630 10 Operating Instructions...
Страница 6: ...Table of Contents 4 Operating Instructions 610 10 630 10 01 0 01 2021...
Страница 16: ...Safety 14 Operating Instructions 610 10 630 10 01 0 01 2021...
Страница 44: ...Operation Operating Instructions 610 10 630 10 01 0 01 2021 42...
Страница 84: ...Settings via software Operating Instructions 610 10 630 10 01 0 01 2021 82...
Страница 96: ...Maintenance Operating Instructions 610 10 630 10 01 0 01 2021 94...
Страница 112: ...Decommissioning 110 Operating Instructions 610 10 630 10 01 0 01 2021...
Страница 116: ...Disposal 114 Operating Instructions 610 10 630 10 01 0 01 2021...
Страница 136: ...Troubleshooting Operating Instructions 610 10 630 10 01 0 01 2021 134...
Страница 140: ...Appendix Operating Instructions 610 10 630 10 01 0 01 2021 138 Fig 65 Dimensions for manufacturing a table top 2...
Страница 147: ......