DuraTrel Courtyard Arbor 11111 Скачать руководство пользователя страница 1

   Model#

11111

Assembly Instructions

Part #

Description

Box#

1 4" sq. x 84" Left Post

1

2 4" sq. x 84" Right Post

1

3 1½ x 4 x 29½" Top/Bottom Cross Rail 2
4 1½ x 4 x 29½" Center Cross Rail

1

5

⅝ x 61" Tube

1

6 1½ x 4 x 84" Arbor Top Rail

1

7

⅞ x 1½ x 84" Arbor Top Overhead Rail

1

8

2" sq. x 26¾ Arbor Top Cross Rail

2

9 4" sq. Gothic Cap

2

10

24" Steel Ground Anchor (U-shaped)

1

11

Hardware Bag

(includes:)

2

4" End Cap
⅞ x 1½" End Cap
1¼" Painted Screw

PLEASE READ THROUGH BEFORE BEGINNING ASSEMBLY.

#8 - 1" Painted Self Tapping Screw

IMPORTANT:  Check boxes for Contents Listed

Super Glue Tube

Check inside of parts as some parts are packaged
inside of others

In the event of missing, damaged or defective parts
please call our customer service dept. at 1-877-258-6020

When assembling components, place on a clean, flat
non-abrasive surface to avoid scratches

… Battery or Electric Drill 

 with #2 phillips bit

Tape Measure

Hammer or Rubber Mallet

 (recommended)

Shovel or Post Hole Digger 

(recommended)

150 Birch Road

P.O. Box 122

Sheboygan Falls,  WI  53085

www.dura-trel.com

[email protected]

Tools Required

1-877-258-6020

1

4

General Information

4

4
1

34

5
4

2
2

2

10

2
4

Qty

2

Courtyard Arbor

8
1

Содержание Courtyard Arbor 11111

Страница 1: ...d Self Tapping Screw IMPORTANT Check boxes for Contents Listed Super Glue Tube Check inside of parts as some parts are packaged inside of others In the event of missing damaged or defective parts please call our customer service dept at 1 877 258 6020 When assembling components place on a clean flat non abrasive surface to avoid scratches Battery or Electric Drill with 2 phillips bit Tape Measure ...

Страница 2: ...a Trel Inc is not responsible for damages to product during shipping E Damage attributable to atmospheric pollutants hail lightning hurricane tornado wind borne objects earthquake fire mildew casualty act of God building or ground settlement or subjection to stress or weight CLAIMS AND REMEDIES If a Dura Trel Inc product is determined to have a manufacturing defect which is covered by this warrant...

Страница 3: ... part 3 into top 1 x 4 hole inserting free ends of tubes into top rail Insert free ends of cross rails into corresponding holes of one right post part 2 Slide one 24 steel ground anchor part 10 into bottom of each post so bottom cross rail slides into U Shape Using two 1 screws per post screw bottom of arbor panel together DO NOT screw together center or top cross rails Remove 24 steel ground anch...

Страница 4: ...into post and then into 84 arbor top to lock arbor together Using four 1 screws per post screw together top and middles of each arbor panel Be sure all parts are full inserted before securing Place two 84 arbor top overhead rails part 7 onto five arbor top cross rails with pilot holes lining up Using five 1 screws per part fasten overhead rails to top cross rails Apply glue to inside edges of 4 sq...

Страница 5: ...yout drawing pound ground anchors into ground according to dimensions When pounding into ground use block of wood to prevent ground anchor from bending Slide arbor over ground anchors Using 1 self tapping white head screw fasten post to ground anchor Option 3 Using ground anchor installation layout drawing dig holes 16 deep according to dimensions Fill with cement and place ground anchors in wet c...

Отзывы: