5)
Thread the Ribbon Supply underneath the Ribbon Mechanism.
Flange of the Spindle is on the right-hand side of the machine.
*TIP: Look under the Ribbon Mechanism to make sure the Ribbon Supply is not cov-
ering the word ‘RIBBON’ that is on the inside of the machine under the Ribbon
Mechanism..
Figure 5. Ribbon Supply applied correctly.
17
3)
Take the Ribbon Supply Spindle
(6, pg. 14)
with the flange on the right side and
put the Ribbon Supply on it with the Ribbon Supply facing towards the back of the
machine and extending over the top of the Ribbon Supply Spindle.
4)
With the Ribbon Supply facing towards the back of the machine and the flange of
the Ribbon Supply Spindle is on the right side, first put the left side of the Ribbon
Supply Spindle in the provided spot of the Ribbon Mechanism and then the right
side (with flange).
Figure 3. Flange of the Spindle should be on the right-hand side of the machine
as demonstrated above.
Figure 4. Step 3 Loading of Ribbon Supply on the Ribbon Supply Spindle.
White arrow demonstrates which end of the Ribbon Supply Spindle is inserted into
the Ribbon Supply.
16
Содержание 4 TTP
Страница 1: ...DuraLabel 4 TTP User s Guide ...