![DURAG D-R 290 Скачать руководство пользователя страница 140](http://html.mh-extra.com/html/durag/d-r-290/d-r-290_operating-manual_2541137140.webp)
7 | Checking / setting parameters with D‑ESI 100
140
D-R 290
Reference point check setpoint
During reference point measurement the mesh filter is moved into the measuring
beam (see
; mesh at the measuring beam diaphragm). The opacity is meas
ured, compared with the setpoint, and scaled to the signal range.
TC Variable type code
SA Signal range start
N Zero point check value
S Signal range 100%
SE Signal range end
R Reference point test setpoint 70%
Table 7.10: Reference point check setpoint
Parameters
Default value
Unit
Reference point check setpoint
70
%
Table 7.11: Default value setpoint
The reference point test setpoint can be between 5 and 95 % of the value input to the
signal range. The measured value is divided by the setpoint calibrate in the factory
(~12% OP SP) and scaled according to the prevailing setpoint (see above, Tab. Ref
erence point check setpoint "R"; generally 70%).
(Signal range start <- Signal range -> Signal range end;
see section
The zero point setpoint is 0 (zero). This value is fixed and cannot be adjusted or
changed.
Control cycle step duration and control cycle interval
The control cycle step duration and the control cycle interval can be set for the control
cycle (0=automation checking cycle disabled). The setting is advised (generally 12 or
24 h) if the system is integrated into a monitoring system. This system can be pro
grammed to respond if the values deviate from the specified values.
Parameters
Default value
Unit
Control cycle step duration
30
Seconds
Control cycle interval
0
Hours
Table 7.12: Specified values for control measurements
7.7.1
7.7.2
Содержание D-R 290
Страница 12: ...12 D R 290 ...
Страница 18: ...1 General 18 D R 290 ...
Страница 20: ...20 D R 290 ...
Страница 28: ...2 Safety 28 D R 290 ...
Страница 30: ...30 D R 290 ...
Страница 38: ...3 Delivery 38 D R 290 ...
Страница 40: ...40 D R 290 ...
Страница 60: ...4 Product description 60 D R 290 ...
Страница 106: ...106 D R 290 ...
Страница 152: ...152 D R 290 ...
Страница 174: ...8 Maintenance 174 D R 290 ...
Страница 176: ...176 D R 290 ...
Страница 177: ...9 Appendix D R 290 177 Appendix Measurement point questionnaire Fig 9 1 Measurement point questionnaire 1 9 9 1 ...
Страница 178: ...9 Appendix 178 D R 290 Fig 9 2 Measurement point questionnaire 2 ...
Страница 188: ...9 Appendix 188 D R 290 Fig 9 11 Dimensional diagram D TB 100 supply unit Dimensional diagram purge air unit D BL 9 3 7 ...
Страница 193: ...9 Appendix D R 290 193 Fig 9 18 Dimensional diagram weather protection cover control electronics protective device ...
Страница 194: ...9 Appendix 194 D R 290 ...
Страница 200: ...11 Index 200 D R 290 ...
Страница 202: ...GmbH Kollaustraße 105 22453 Hamburg Germany www durag com ...