How A Hot Water System Operates

Entire heating system (boiler, piping, and radiation units) 

is filled with water. As water in the boiler is heated, it 

is circulated from top of boiler through supply main to 

radiation units. Cooler water in radiation units flows back 

through return piping through return main into the boiler. 

This arrangement provides positive and rapid response to 

the thermostat.

Filling The System With Water 

OPTION #1

 This method utilizes boiler piping as shown in 

figures 7, 8 and 9.

A.  Close

 main shutoff valve, isolation valves, and zone 

valves (if applicable). If bypass piping is installed, 

also close two throttling valves. Leave boiler service 

shutoff valve (if installed) and balancing valves to 

each heating zone 

fully open.

B.  Open following valves in order: drain valve for power 

purging, isolating valves before and after boiler 

circulator (if applicable), both throttling valves (if 

applicable), and then open fill line shutoff valve. Water 

will fill bypass piping and push air through piping and 

out power purging drain valve. When power purging 

drain valve runs air free, close bypass piping throttling 

valve (leaving throttling valve to supply piping fully 

open).

C. 

Next, 

open

 isolation valve (or zone valve) to first 

zone. Water will fill piping and push any air out power 

purging drain valve. When power purging drain valve 

runs air free, close isolation valve or zone valve). 

Repeat this procedure for remaining heating zones.

D. 

Once all zones are filled with water and purged of air, 

close

 power purging drain valve and fill line shut off 

valve,

 open

 main shutoff valve, and 

adjust

 throttling 

valves and balancing valves as required.

OPTION #2  

• Close air vents on all radiation units. 
• 

Open valves to radiation units. Verify boiler drain valve, 

expansion tank drain cock, and air bleed screw on 

expansion tank drain fitting are closed. 

• 

Open fill valve on piping to expansion tank. 

• Open water inlet to boiler and leave it open. 
• Open air vent on lowest radiation unit. 
• 

When all air has escaped and water starts to flow from 

vent, close it. 

• 

Go to next radiation unit, and repeat this process until 

finishing with highest radiation unit. 

• 

If heating system has automatic vents, this manual 

venting is unnecessary but it will speed up proper filling 

of the system.

If system is a closed expansion tank system, automatic fill 

valve is needed. Leave automatic fill valve open to refill 

system automatically as needed. 
Note initial fill pressure on boiler’s temperature / pressure 

gauge, which should be 10-15 psig. Any lowering of 

pressure from its initial fill pressure indicates loss of water 

due to leakage. Automatic fill valve should then compensate 

for this water pressure loss. If it does not, manually open 

this valve to refill system until needle is again pointing to 

same pressure reading. Instructions are packaged with 

valve.

FILLING THE BOILER  

 

PN 240013012, Rev. B [12/15/2020]

Содержание EMPIRE 3EWC0.80

Страница 1: ...ON MAINTENANCE MANUAL Maximum Allowable Working Pressure 50 psi Models 3EWC0 80 T 4EWC1 00 T 4EWC1 25 T 5EWC1 55 T Manufactured by ECR International Inc 2201 Dwyer Avenue Utica NY 13501 Tel 800 325 54...

Страница 2: ...at this heat stays in the structure Net AHRI Rating represents portion of remaining heat that can be applied to heat radiation or terminal units finned tube baseboard cast iron radiators radiant floor...

Страница 3: ...British Thermal Unit Heating Capacity based on 13 1 CO2 with a 0 02 w c draft over fire and a 1 smoke or less Testing was done in accordance with the D O E Department of Energy test procedure gph Gal...

Страница 4: ...nent injury Children elderly and infirm or physically handicapped persons are more likely to be permanently injured by hot water Never leave them unattended in bathtub or shower Never allow small chil...

Страница 5: ...e hindered by overfilling the boiler Recommend initial fill pressure of 10 12 psig For higher fill pressures expansion tank s air charge will need to be increased to match fill pressure Consult manufa...

Страница 6: ...uire attention Install boilers at least 6 from combustible material on left side rear and above and at least 24 on right side and front Allow at least 24 accessibility clearance above for servicing 5...

Страница 7: ...IN RETURN LINE OR AFTER THE EXPANSION TANK SHUT OFF VALVE OIL FILTER OIL LINES FOUNDATIONS TO OUTSIDE LINES TO OTHER APPLIANCES SERVICE LINE OVERCURRENT PROTECTED SAFETY SWITCH 2 FILL PIPE MIN 2 I D...

Страница 8: ...y with additional room s of sufficient volume so the combined volume of all spaces meets the criteria for unconfined space Total input of all combustion equipment installed in combined space shall be...

Страница 9: ...3 When communicating with outdoors through horizontal ducts each opening shall have minimum free area of one square inch per 2 000 Btu per hour of total input rating of all equipment in the enclosure...

Страница 10: ...res 6a and 6b A Install safety relief valve with spindle in vertical position B Do not install shutoff valve between boiler and safety relief valve C Install discharge piping from safety relief valve...

Страница 11: ...ally cause damage to boiler and venting system Minimum design return water temperature to prevent this condensation in boiler and venting is 120 F Boiler used in heating system where design water temp...

Страница 12: ...NOTE CIRCULATOR CAN ALSO BE INSTALLED ON RETURN PIPING PIPING ARRANGED FOR POWER PURGING AIR OUT OF SYSTEM PIPING REFER TO THIS MANUAL S SECTION ON FILLING THE SYSTEM WITH WATER OPTION 1 Figure 8 Syst...

Страница 13: ...XPANSION TANK PIPING ARRANGED FOR POWER PURGING AIR OUT OF SYSTEM PIPING REFER TO THIS MANUAL S SECTION ON FILLING THE SYSTEM WITH WATER OPTION 1 SYSTEM PIPING Figure 9 System Piping Arrangement Zonin...

Страница 14: ...G PUMPS AWAY FROM EXPANSION TANK PER THIS MANUAL USE OPTION 2 IN FILLING THE SYSTEM WITH WATER THIS PIPING ARRANGEMENT CAN BE USED WITH ZONE VALVES OR ZONE CIRCULATORS SYSTEM PIPING Figure 10 System P...

Страница 15: ...uous flow NOTICE Do not use tankless coil if your water is excessively hard with lime or other deposits which will accumulate inside the coil When using tankless coil the Hydrolevel control is mounted...

Страница 16: ...ent installations shall be in accordance with applicable provisions of NFPA 31 Standard for the installation of Oil Burning Equipment latest edition and applicable provisions of local building codes N...

Страница 17: ...e boiler Install chimney connector start at boiler with vertical pipe elbow then install draft regulator horizontally When regulator is in place start at chimney and work back to the regulator Join th...

Страница 18: ...THAN HIGHEST PART OF PASSAGE THROUGH ROOF MUST BE AT LEAST 2 FT HIGHER THAN ANY NEIGHBORING OBJECT WITHIN 10 FT MUS MUST HAVE AN UNOBSTRUCTED TOP OPENING TYPICAL CHIMNEY CONNECTION Figure 12 Typical...

Страница 19: ...lations Connect 120 volt electrical supply to L1 and L2 terminals and two thermostat wires to T and T terminals on Hydrolevel limit control Run separate circuit from separate over current protection d...

Страница 20: ...20 ELECTRICAL WIRING Figure 13 Hydrolevel 3250 Control with Beckett or Carlin Burner PN 240013012 Rev B 12 15 2020...

Страница 21: ...21 Figure 14 Hydrolevel 3250 Control with Riello Burner ELECTRICAL WIRING PN 240013012 Rev B 12 15 2020...

Страница 22: ...e runs air free close isolation valve or zone valve Repeat this procedure for remaining heating zones D Once all zones are filled with water and purged of air close power purging drain valve and fill...

Страница 23: ...rner flame will be dark orange and formation of soot will occur in heating unit In buildings of conventional frame brick or stone construction that do not have utility rooms basement windows or stair...

Страница 24: ...1HP 0 80 2 1 4 0 65 60 W 150 0 60 0 65 50 4EWC1 00 T EZ 1HP 1 00 2 1 4 0 85 60 B 150 0 85 1 00 60 4EWC1 25 T EZ 1HP 1 25 2 1 4 1 00 60 B 155 0 85 1 00 75 5EWC1 55 T EZ 1HP 1 55 2 1 4 1 25 60 B 155 1 1...

Страница 25: ...trode Setting Figure 17 Riello Turbulator Setting Figure 18 Carlin Electrode Setting Turbulator Setting A Loosen NUT 1 turn SCREW 2 until INDEX MARKER 3 is aligned with correct index number per Burner...

Страница 26: ...chamber is very hot Adjust Thermostat Heat Anticipator or Thermostat Cycle Rate According to Instructions Included With The Thermostat Check Thermostat Operation Follow instructions included with you...

Страница 27: ...manually refill system Diaphragm Expansion Tank Tank may become water logged Frequent automatic opening of safety relief valve indicates water logging High boiler temperature accompanied by unusually...

Страница 28: ...nd of flue brush off and inserting it into drill When brushing take care to not damage target wall with flue brush 6 Carefully vacuum soot accumulations from combustion chamber area take care to not d...

Страница 29: ...ure head location and size if applicable are per manufacturer s recommendations If burner being used has damaged head replace head with same head recommended for use on this boiler 6 Inspect and clean...

Страница 30: ...ectric power supply circuit is ON Controls out of adjustment Reset according to instructions Radiators not heating Open radiator vents to excess air Check flow control valve if used It may be in close...

Страница 31: ...31 PUMP CURVES 15 10 5 0 5 4 3 2 1 m Head 1 2 3 4 5 US GPM 5 10 15 20 m h 3 Head feet Grundfos UP15 42F Pump Curve B G NRF22 Pump Curve PN 240013012 Rev B 12 15 2020...

Страница 32: ...decreases This feature is equipped with an override which is provided primarily to permit the use of an external energy management system that serves the same function THIS OVERRIDE MUST NOT BE USED U...

Отзывы: