35
8.8 Indirect Storage Tank
A
Heating system
B
Three way diverter valve
C
Heating water flow
D
Heating supply to DHW indirect storage tank coil
E
Heating water return
F
Tank
G
Optional 10k Ω DHW priority sensor tank
Boilers DCBF-125 can be electrically connected to indirect
storage tank as follows:
• Connect DHW priority
10K
Ω
sensor NTC to terminals
9-10 on terminal block M2.
• Insert
10K
Ω
NTC sensor element in the sensor well of
indirect storage tank.
• Verify exchange capacity of the storage boiler coil is
appropriate for boiler power.
• Adjust DHW tempe95 °F...+140 °F (+35
°C...+60 °C) by pressing
on boiler Control.
IMPORTANT: set parameter P03 = 05 as described in:
"PARAMETER SETTINGS".
FIGURE 8-7A Kt Indirect Storage Tank
*125 Model shown
Note
Sensors used for this boiler are proprietary to
the manufacturer. Use of after market sensors
will diminish boiler performance.
8 - ELECTRICAL CONNECTIONS
240012564 REV A, [05/15/2019]