Infinity™
Series Servo Ultrasonic Press Systems QUICK START GUIDE
18
SE
CTION 4
| C
ONTR
OLS
AND
I
NDICA
TORS
Before operating the welder, the tooling must be installed, and the thruster properly positioned on the support column.
Attaching the Fixture on the Base
If the fixture is not mounted to the base, follow these instructions, referring to the illustration below:
1.
Place the fixture on the base.
2.
Initially align the two slots in the fixture over two of the eight mounting holes on the base.
3.
Install the two fixture hold-down bolts with hardened washers, as shown in Fig. 4-1, but leave the bolts
loose at least 1 turn.
Figure 4-1
Placing the Fixture on the Plate
WARNING
Any fixture manufactured by a third party must comply with all OSHA and
ANSI requirements. All fixtures must be guarded as necessary. Dukane does
not assume any responsibility or liability for fixtures manufactured by the
customer or any third party manufacturer.
Tooling Setup
Содержание Infinity 43NSLA
Страница 5: ...S ection 1 I ntroduction SECTION 1 Introduction ...
Страница 42: ...Infinity Series Servo Ultrasonic Press Systems QUICK START GUIDE 38 S ection 6 Operation SECTION 6 Operation ...
Страница 65: ...Please refer to our website at www dukane com contact us to locate your local representative ...