PROCEDURE

Engine Generator Set only

Move the selector switch on the engine generator to the

“RUN” position.  The engine-generator will crank and start
automatically.  If the engine fails to start, return selector
switch to the “stop” position and correct the trouble before
proceeding.

 With the engine running smoothly, check the no load

voltage and frequency at terminals G1 and G3 on the
generator terminal block in the A.T.S.  The voltage
between G1 and G3 should be between 240 +/- 5 volts.
The frequency should be between 61.5 to 62 hertz (Hz).
The voltage should also be checked between the hot
terminals (G1 and G3) and the G-N to be certain of a
balanced voltage output and  a solid neutral connection.
The voltage between G1 and G-N should be about one
half of the line to line (G1 to G3) voltage or approximately
120 +/- 3 volts AC.  The same approximate voltage should
be found between terminals G3 and G-N.

** Notice **

If for any reason during the check out procedure the
voltage and frequency are not correct, turn the selector
switch to the “STOP” position and correct the trouble
before proceeding.

After verifying the voltage and frequency are correct,

turn the selector switch to the “STOP” position.  The unit
should shut off with no time delay.  You are now ready to
test the automatic start function.

Move the toggle switch to the “AUTO” position and

follow the instructions in the manual you received  with the
transfer switch for initial start up and testing.  Each of the
transfer switches has a different procedure. Remember
the unit will go into a short time delay before starting after
it receives the start signal from the transfer switch.

 If it fails to start at this time, check your DC interconnec-

tion wiring.   As long as line power is still applied to the
transfer switch during this test period the A.T.S. will not
transfer the load to the generator.  Remember that there is
a 90 second cooldown delay built into the engine control,
so the unit will run during this period after the A.T.S. tells it
to stop.

Next you need to test the complete system.  To accom-

plish this you will have to fail the incoming line power to
the A.T.S. panel.  All the loads connected to the A.T.S.
should now be dead.  The engine generator set will go
into a 3 to 10 second start delay. At the end of the start
delay the unit will start up.  As soon as the engine
generator set reaches operating speed the transfer switch
will transfer the load to the engine generator on the Winco
Non-UL switches on the UL switches there is a short
delay before it transfers.

Restoring the line power will allow the transfer switch to

return the load to line power.

The restoration of line power also sends a stop signal to

the engine generator set.  This stop signal will activate a
cool down timer circuit.  The engine generator will shut
down 90 seconds later.  The UL switches will have an
additional cool down delay built into the switch of as long
as 5 minutes.

This completes your installation and unit testing.

ALWAYS leave the system in automatic mode unless
servicing the unit. For automatic operation, keep both the
generator set and transfer selector switches in the
“AUTOMATIC” position.

TROUBLESHOOTING TABLES

         *************
*****  WARNING  *****
         *************
NEVER JUMP START THESE UNITS.
JUMP STARTING THESE UNITS WITH
LOW OR BAD BATTERIES WILL CAUSE
PERMANENT DAMAGE TO THE ENGINE
CONTROL MODULE.

UNIT WILL NOT CRANK WHEN THE
POWER FAILS.

1.

Generator control switch not in “AUTOMATIC”
position.

2.

Low or dead battery, must hold 12 volts during
cranking.

3.

Incorrect wiring between transfer switch and
generator.

4.

Circuit breaker tripped on engine control.

5.

Loose or dirty battery terminals.

6.

Defective “RUN/TEST/AUTO” switch.

7.

Defective starter.

8.

Defective start solenoid.

9.

Defective start/stop control in the transfer switch.

10. Engine Control in fault from previous run cycle.
11. Blown 3/4 amp fuse on generator control panel.

ENGINE WILL NOT CRANK WITH GENERATOR
SELECTOR SWITCH IN THE START POSITION.

1.

Low or dead battery, must hold 12 volts during
cranking.

2.

DC circuit breaker on control module tripped.

3.

Blown 3/4 amp fuse on generator control panel.

4.

Loose or dirty battery terminals.

5.

Defective “RUN/OFF/AUTO” switch.

6.

Defective starter.

7.

Defective start solenoid.

8.

Locked up engine generator set.

ENGINE CRANKS BUT WILL NOT START.

1.

Improper fuel pressure being delivered to unit.

2.

Fuel  supply shut off.

3.

Fuel tank empty.

Содержание WINCO PSS15B2W/A

Страница 1: ...PACKAGED STANDBY SYSTEM PSS15B2W A INSTALLATION AND OPERATORS MANUAL Engine Generator Set...

Страница 2: ...rication 6 Battery Installation 6 Connecting Battery Charger 6 TRANSFER SWITCH INSTALLATION 6 AC Electrical Connections 7 DC Electrical Connections 8 INITIAL START UP 8 TROUBLESHOOTING INFORMATION 9 W...

Страница 3: ...ut of reach of children c Do not smoke or use open flame near the generator set or fuel tank d Keep a fire extinguisher nearby and know its proper use Fire extinguishers rated ABC by NFPA are appropri...

Страница 4: ...UNIT LINE SIDE GENERATOR CONTACTOR SIDE CONTACTOR PSS15B2W A 100AMPS 60 AMPS UL Automatic Transfer Switch Sizes UNIT LINE SIDE GENERATOR CONTACTOR SIDE CONTACTOR PSS15B2W A 100 AMPS 100 AMPS 200 AMPS...

Страница 5: ...rrier for claim procedures Be sure to retain the packaging material for carrier inspection Concealed Damage is understood to mean damage to the contents of a package which is not evident at the time o...

Страница 6: ...stays clean WARNING FIRE HAZARD DO NOT OVERTIGHTEN THE FUEL LINE THIS IS A TAPERED FITTING OVERTIGHTENING WILL CAUSE THE FITTING TO CRACK AND LEAK FUEL For all vapor fuel systems the delivery pressure...

Страница 7: ...n inches of water column The second is with a pressure gauge calibrated in ounces per square inch Reference numbers 1 through 3 in the block diagrams above are system parts supplied by customer Refere...

Страница 8: ...battery terminal is connected to the negative cable ground from the engine generator assembly All connections must be clean and tight Check the electrolyte fluid in the battery periodically to be sure...

Страница 9: ...ion panel should contain your only neutral to ground bond All power leads from the generator to the A T S must be sized to handle rated generator output amperage at a minimum the type of wire you use...

Страница 10: ...anded wire should be used These wires will be labeled Bat and Start The control wires will be connected as follows in the generator control terminal box ATS Panel Generator Control Panel Start 1 to Wi...

Страница 11: ...s you will have to fail the incoming line power to the A T S panel All the loads connected to the A T S should now be dead The engine generator set will go into a 3 to 10 second start delay At the end...

Страница 12: ...be 3600 RPM 9 AC short on output leads PREVENTIVE MAINTENANCE Reasonable care in preventive maintenance will insure high reliability and a long life for the engine generator set and the Automatic Tra...

Страница 13: ...PAGE 11 4190 00 60706 169 AC AND DC GENERATOR WIRING DIAGRAM...

Страница 14: ...PAGE 12 60706 169 4190 00 AC AND DC GENERATOR SCHEMATIC...

Страница 15: ...PAGE 13 4190 00 60706 169 GENERATOR LAYOUT...

Страница 16: ...ility and fitness for a particular purpose are limited to 12 months from date of purchase In no event is WINCO liable for incidental or consequential damages Note Some states do not allow limitation o...

Отзывы: