Test outputs and test run
TEST OUTPUTS
When completing an installation or repair, cycle all outputs, such as fill valve,
drain valve, etc ., to verify operation . Go to the test outputs section of the
Settings menu and scroll through each connected output to verify operation .
During testing, the humidifier mode changes to Standby and the tank status
changes to Test .
TEST RUN
Vapor-logic has a test run capability to confirm system functionality . This
capability allows a technician to simulate a demand for steam production
when there isn’t one (such as when performing routine maintenance) . To
confirm functionality, go to the test run section of the Settings menu . Set system
demand percent and set test run time duration . During testing, the humidifier
mode changes to Standby and the tank status changes to Test .
Table 65-1:
Test outputs and test run
Menu item
Default value
Minimum
value
Maximum
value
Units
Description
Test outputs
Fill valve
--
--
Cycles output to verify operation .
Pulse fill valve
--
--
Drain valve
--
--
Cycles output to verify operation .
Fan control
--
--
Dry contact relay 1 or 2
--
--
Ignition module 1 or 2
--
--
Blower speed control
--
--
Tests both blowers,
Test run*
Test run percent
0
0
100
%
Set demand percent value between 0 and 100 to test .
Test run time
0
0
30
minutes
Set test run time duration between 1 and 30 minutes .
Start
Stop
* Humidifier test run will not occur if safety circuits (for example, duct high limit switch, airflow proving switch, or safety interlock switch) are not
operating correctly .
OPERATION