Dreamline ENIGMA-X Скачать руководство пользователя страница 1

 

 

ENIGMA X

 

S

HOWER 

D

OOR & 

T

UB 

D

OOR 

I

NSTALLATION 

I

NSTRUCTIONS

 

 

IMPORTANT

 

DreamLine

TM

 reserves the right to alter, modify or redesign products at any time 

without prior notice. For the latest up-to-date technical drawings, manuals or any 
other details please refer to the 

support.bathauthority.com

 web page. 

 

  

 

 
 

 

 

Please carefully read the instructions before installing. If you have any questions 

regarding installation, please call our technical support specialists Monday through 
Friday 9:00 AM – 5:00 PM EST at 1-866-731-8378, ext. 3 or e-mail our technical 
support group at 

[email protected]

 
 

Rev 1.1 

1

For more information on 

DreamLine

TM

 Shower Doors

 & 

Tub Doors

 please visit 

www.BathAuthority.com

 

Содержание ENIGMA-X

Страница 1: ...lease refer to the support bathauthority com web page Please carefully read the instructions before installing If you have any questions regarding installation please call our technical support specia...

Страница 2: ...he walls are at right angles While some adjustment in leveling of the door is possible irregular installation surface level or improper angle of side walls will result in serious problems for your ins...

Страница 3: ...pcs 07 Glass bracket 2pcs 17 Round head screw ST4 2 25 3pcs 08 Guide rail bracket 2pcs 18 Round head screw ST4 2 30 1pcs 09a Wall anchor 3 8 2pcs 19 Wall bracket 1pc 09b Wall anchor 5 16 1pcs 20 Rolle...

Страница 4: ...the Guide rails and you can continue to Step 3 If W 48 you will need to cut the Guide rails from the end which is farther from the Glass brackets 07 hole The length to cut off will be L L 48 W b 60 I...

Страница 5: ...rily Slide the Guide Rail brackets 08 on each end of the Upper guide rail and temporarily secure them as well Assemble the Wall Bracket 19 onto the bottom corner of the Stationary glass 02 See Fig 3 a...

Страница 6: ...ith the shower base or threshold If a horizontal adjustment is required adjust it in the Glass brackets See Fig 5 for details Fig 5 5 Outline the position of the Wall bracket 19 and Guide Rail bracket...

Страница 7: ...kets 08 using 3 8 drill bit and insert the Wall anchors 9a See Fig 7 for details Fig 7 7 Fasten the Wall bracket to the wall using the Round head screw ST4 2 30 18 Mount the male parts of the Rail bra...

Страница 8: ...See Fig 9 for details Fig 9 9 Fasten both female parts of the Guide rail brackets 08 to their male parts on the walls Tighten the set screws on the Guide rail brackets to secure the Upper guide rail...

Страница 9: ...Cut the Anti splash threshold 15 to the size of X Insert one side of the Anti splash threshold fully into the Guide block and cover the other side with the Threshold bracket 16 Parallel the Anti splas...

Страница 10: ...ecorative plugs See Fig 13 for details Fig 13 12 Attach two Rollers 04 to the Glass door 05 Suspend the door by hanging the Rollers onto the Upper guide rail 03 and slide the bottom edge of the Glass...

Страница 11: ...ass door Adjust both Door stoppers 01 to ensure that they are positioned upright and the door is in its maximum opening and closing range Tighten the set screw to fasten them in place See Fig 15 for d...

Страница 12: ...using either soft cloth or squeegee to prevent soap buildup Never use abrasive cleaners and cleaning products that contain scoring agent because this may scratch the surface Never use bristle brushes...

Страница 13: ...ood act of God or any other casu alty Improper care and cleaning will void the warranty Use of cleaners containing abrasive cleansers ammonia bleach acids waxes alcohol solvents or other products not...

Страница 14: ...TEL 866 731 8378 215 957 1411 FAX 866 227 9245 215 893 1780 WWW BATHAUTHORITY COM Rev 1 1 14 For more information on DreamLineTM Shower Doors Tub Doors please visit www BathAuthority com...

Отзывы: