background image

 

© 2002-2006 DreamLine™. All Rights Reserved                                                                                         DLVG-204

 

1

 

 

DLVG-204 Installation Instructions 

 

 

 

Mounting process: 

 
 

1.

 

Secure the brackets using the joint connection screws. Attach the legs to the bottom of the 

feet. Attach the pads to the top of the brackets. Place rubber rings in the grooves. 

2.

 

Put the drawer in place and secure it to the brackets by the screws provided. 

3.

 

Place the glass top on the brackets. 

4.

 

Place the mounting ring, washer and the glass basin on top of the glass countertop. 

5.

 

Connect trap to drain assembly. Hand tight to check alignment. Use tools if necessary. 

6.

 

Secure the faucet in place. Do not over tighten the nut to avoid breaking the glass top.  

 

 

Отзывы: