background image

© 2002-2006 DreamLine™. All Rights Reserved                                                                                         DLVG-105 

1

 

DLVG-105 Installation Instructions 

 

 

Mounting Process: 

1.

 

Put the back H-shaped frame together using the joint screws. Insert the joint 

screws into the horizontal wooden frame and fasten tight as shown in steps 1-3. 

2.

 

Secure the rest of the frame with screws (step 4-6). 

3.

 

Screw in the legs to the bottom of the frame (Step 7). 

4.

 

Secure the metal supports for the glass countertop (Step 8). 

5.

 

Using screws for shelves secure the shelf brackets to the frame (Step 9, 10). 

6.

 

Insert the glass shelves into the metal brackets (Step 11). 

7.

 

Assemble the glass basin, connect hot and cold water supplies and connect the 

drain. 

8.

 

Assemble the cabinet. 

9.

 

Secure the mirror on the wall at the desired height. 

 

Отзывы: