
© DreamLine
®
All Rights Reserved
© DreamLine
®
All Rights Reserved
Tools Needed
Parts Needed
ALLIANCE PRO/ALLIANCE PRO LT Shower Door Manual Ver 1 2/2021
9
© 2021 DreamLine® All Rights Reserved
01
x2
02
x6
NOTE
Level (plumb) both
Wall Profiles (#01)
and mark the holes for
drilling. Drill three
Ø 5/16” (8mm)
holes on each side wall and
insert the
Wall Anchors (#02)
.
Fig 2
If a stud is present behind the wall:
Drill a
Ø9/64”(4mm)
hole
up to the stud, then drill a
Ø1/8”(3mm)
pilot hole in the wood.
TIP
Be sure all pilot holes are the correct size. Always use low torque and
steady pressure when securing stainless steel screws to avoid stripping or
breaking off the screw heads.
Fig 2
5/16”(8mm)
1
2
3
4
2