![Draper Profile+ Скачать руководство пользователя страница 1](http://html1.mh-extra.com/html/draper/profile/profile_assembly-mounting-instructions_2528522001.webp)
Permanently Tensioned Projection Screen
Assembly & Mounting Instructions
Profile Components:
Tools Required:
Tape Measure Pencil
Hex Head Power Drill Fastening
Screwdriver
Hardware
(By others)
Caution
(1)
Read instructions through completely before proceeding.
(2)
Follow instructions carefully.
Installation contrary to instructions invalidates warranty.
(3)
Screen should be accessible for complete removal should fabric
become damaged or should other service be required.
(4)
Screen should be installed level (using a carpenter’s level).
(5)
Nothing should be fastened to screen frame or viewing surface.
(6)
Make sure you have received all parts (see parts list below and
exploded diagram on page 3).
(7)
Installer is responsible for providing appropriate hardware for mounting.
(8)
Draper recommends using two people for assembly and installation.
When lifting assembled screen, do not lift at only one corner; lift at both
corners. Lifting by one corner could result in damage to the screen
frame, especially on large screens.
(9)
The ideal temperature range for assembling permanently tensioned
screens to prevent damaging the surface is
68°-78° F (20°-26° C).
Assembling below recommended temperatures may damage surface
and void warranty.
5
/
32
"- Grade 8
Hex Screws
(several)
Mounting
Brackets
Sliding Snap
Attachments
(several)
Sliding
Hook & Loop
Attachment
(several)
Frame Extrusion
Section
Trim Frame
Section
Corner
Vertical Support
Connector
Front
View
Back
View
Copyright © 2016 Draper Inc.
Form _IInst16
Printed in U.S.A.
Trim Frame
Corner
Vertical Support
For Larger Sizes