Draper Premier XL Скачать руководство пользователя страница 1

Contents

Overview -

 Components .......................................................................................1

Section 1 -

 Electrical Connections .....................................................................2

PLEASE READ -

 Safety Information ....................................................................2

Section 2 -

 Hanging Screen .................................................................................3

Section 3 -

 Operation............................................................................................3

Section 4 -

 Tab-Tension Adjustment Procedure ..............................................3

Section 5 -

 Limit Adjustments .............................................................................4

Section 6 -

 Dimensions and Methods of Installation ......................................5

Section 7 -

 Wiring Diagrams ................................................................................6

Section 8 -

 Wiring Diagrams ................................................................................7

Section 9 -

 Accessing Internal Low-Voltage Control Unit 

(LVC-IV)

 .................8

Overview -

 Components

 CAUTION 

Read and understand all warnings 

(Page 2 of this document)

 before beginning installation.

1. 

Mounting holes

2. 

Junction box cover

3. 

Dowel

4. 

Front cover

(Targa Pictured)

1

2

3

4

TOOLS  

REQUIRED

POWER DRILL

PENCIL

TAPE MEASURE

HARDWARE

 (by others) 

LEVEL

Draper, Inc.  |  411 S. Pearl St. Spiceland, IN 47385 

draperinc.com  |  765.987.7999  |  800.238.7999  

© 2020 All Rights Reserved 

FORM: Premier_XL_TargaXL_220V_Inst20

Premier XL / Targa XL 220V

Electric projection screen

INSTRUCTIONS

INSTALLATION & OPERATION

If you have any difficulties installing or servicing your  

Premier XL / Targa XL , call your dealer or Draper, Inc. 

Содержание Premier XL

Страница 1: ...omponents CAUTION Read and understand all warnings Page 2 of this document before beginning installation 1 Mounting holes 2 Junction box cover 3 Dowel 4 Front cover Targa Pictured 1 2 3 4 TOOLS REQUIR...

Страница 2: ...used for mounting 5 All hardware must be installed level Unit must be level and square 6 Never leave the area while operating the unit during installation maintenance or normal operation unless it is...

Страница 3: ...fully up Section 2 Hanging Screen General 1 Screen should be lifted into position only by end mounting brackets Keep case level by lifting end plates simultaneously to prevent surface damage Never att...

Страница 4: ...DOWN I limit screw clockwise 3 screw turns 1 2 roller revolution 3 Test by lowering screen Repeat steps 1 2 until desired position is reached To Increase Screen Drop 1 Lower screen to down limit 2 Wit...

Страница 5: ...er must also ensure that wall or ceiling structure is of adequate strength Wall Mounted Appropriate hardware provided by installer Ceiling Mounted Appropriate hardware provided by installer Targa Prem...

Страница 6: ...IV modules can be linked together Receiver Button FUSE 3 15 AMP 250 VAC 5x20mm External LVC IV Single or Multiple Projection Screen Wiring Diagram 220V Blue Common Black Up Brown Down INTERNAL SCREEN...

Страница 7: ...ow Voltage Controller Plug Play 220V Motor with Internal Low Voltage Controller Single Low Voltage Control Internal Screen Wiring Blue Neutral Brown Green Ground 220V Multiple Low Voltage Controls Int...

Страница 8: ...housing 3 Remove the access panel with the LVC IV from the screen housing nnection hole en housing ow Voltage ng Electrical Connection Hole Remove two 2 Hex head screws from endcap Remove access panel...

Отзывы: