Installation Instructions

506992 "Force" Outdoor Basketball Backstop by Draper

Copyright ©2005 Draper Inc. 

Form EZ-506992_Inst05 

Printed in U.S.A.

 

 

 

 

If you encounter any diffi culty installing or ser vic ing your 

506992 

Outdoor Basketball Backstop by Draper

, call your dealer or 

Draper, Inc., Spiceland, Indiana, (765) 987-7999; fax (765) 987-
7142.

  Choose the proper location to dig for the concrete footing. When choosing 

 

the exact position to dig, make sure to maximize the amount of playing 

 

surface while minimizing possible driveway obstruction.

  Dig hole 42" deep and 24" square. Be sure to bell out the bottom 12" of 

 

the hole to give added stability to the footing. 

NOTE:

 If you live in an area where the frost line is below 42" it is advisable to 

dig to normal frost line. 

Do not cheat

 on the hole size: It is imperative that the 

hole be a minimum of 42" deep and 24" square!

  Assemble the anchor kit as shown in Fig. B (page 2). Thread a 

5

/

8

" hex nut 

 

(L) 2½" of the way onto each J-Bolt (K). Place the threaded end of each J-

 

Bolt through the 4 holes located in the anchor template (M). Then thread a 

 second 

5

/

8

" nut onto each J-Bolt until tight against the template, making 

 

sure to keep the J-Bolt hooks pointing in toward the center of the tem-

 plate.

  For this step you will need: Level; Broomstick; Tape Measure. The 42" x 

 

24" anchor footing will require approximately ½ yard of 3000 psi concrete 

 

(30-32 60# sacks of premix concrete). More will be needed if you dig a 

 

larger hole. Make certain that you have enough concrete to fi nish the job. 

 

Allowing a portion to dry while you purchase more concrete will weaken 

 the 

footing.

  Mix the concrete according to the instructions on the bag. It is better to 

 

mix it slightly wet than too dry. Fill the hole full to ground level with as little 

 

time between batches as possible. Insert the broomstick in 3 or 4 different 

 

places and vibrate up and down to settle the concrete. Submerge the (4) 

 

anchor footing rebar pieces (N) into the center of the hole spaced evenly. 

 

Next, set the anchor bolt assembly into the wet concrete, vibrate it as it 

 

goes in to make sure the concrete fi lls in around the J-Bolt hooks. Make 

 

sure the template is pressed fi rmly against the top of the wet concrete. 

 

Use the level to ensure that it is level in all directions. Additionally, the 

 

center line of the J-Bolts must be parallel with the edge of the playing 

 

surface (see Fig. C, page 2).

STOP HERE! Allow footing to cure for seven days before proceeding.

  Take off the top 

5

/

8

" nuts from the J-Bolts, remove the template and dis-

 card 

it.

  Thread a second 

5

/

8

" nut on to each J-Bolt down against 

 

the nut embedded in the concrete.

  Place the vertical post (A) down over the footing making 

 

sure not to damage the J-Bolt threads. Using (4) 

5

/

8

" lock-

 

washers and the fi nal (4) 

5

/

8

" hex nuts, bolt down post fi nger 

 

tight with welded tabs facing away from playing surface.

  Level the vertical post by adjusting the 

5

/

8

" nuts located 

 

underneath the base plate. Then tighten top nuts against 

 

the top side of the base plate.

  Attach both pivot stop caps (W) over the ends of the square 

 

blocks (pivot stops) welded near the upper end of the post.

IMPORTANT: FROM THIS POINT FORWARD DURING 
ASSEMBLY, BE SURE TO SPREAD A GENEROUS LAYER 
OF ANTI-SEIZE LUBRICANT OVER THE ENTIRE SHAFT 
OF EACH ½” HEX BOLT. THIS LUBRICANT WILL GUARD 
AGAINST RUST, AND HELP ENSURE PROPER PIVOT OP-
ERATION IN YEARS TO COME. NOTICE: Anti-Seize lubricant 
is EXTREMELY MESSY. An old toothbrush, etc. may be used 
to smear lubricant onto bolts instead of using your fi nger. Have 
clean up rags available.
 

Slide the main arm (B) over the top of the vertical post and 

 

attach to the lower pivot tube with a ½" x 10" hex bolt (H) 

 

and ½" locknut (J). Be sure to smear lubricant on bolt 

 shaft.

 

Slide the hole located in the rim height indicator (T) (black plastic with 

 

hole in one end) over one of the second set of welded tubes in the main 

 

arm. Attach the spring-assist cartridge (E) to the second set of attachment 

 

holes on both the main arm and the vertical post welded tabs utilizing a 

 

½" x 10" hex bolt (H) and a ½" x 4½" hex bolt (G). Tighten each with a ½" 

 

locknut (J). The rim height indicator should now hang freely along side the 

 

spring-assist cartridge. Be sure to smear lubricant on bolt shaft.

 

Next attach the hand crank adjustment cylinder (F) using a ½" x 10" hex 

 

bolt (H) and ½" x 4½" hex bolt (G). Tighten each with a ½" locknut (J). 

 

Next, remove and discard the wooden spreader block from the spring-as-

 

sist cartridge. Be sure to smear lubricant on bolt shaft.

Vertical Post
Part A

Hand
Crank

Spring Assist
Part E

Rim Height
7’
10’

Distance from face of backboard
to front of vertical post
62”
48”

Rim Height Indicator
Part T

Pivot Stop

Rim

Backboard

Backboard Mount
Part D

Upper Parallel Linkage
Part C

Main Extension Arm
Part B

 11

 12

 13

Caution

  Immediately unpack all components and cross check against bill of 

 materials.

  Spring-assist cartridges are shipped under tension. Do not remove 

 

wooden spreader blocks from spring-assists until instructed to do so.

  Injury may occur if linkages are allowed to fall off main arm during as-

 

sembly. Be sure to smear lubricant on bolt shaft.

  Allow concrete footing to cure for seven days before completing 

 

installation. It is advisable to wait up to two weeks to allow the anchor 

 

footing to fully cure before aggressive play.

  Follow instructions carefully.

Bill of Materials     

A  (1) Vertical Post  

(12) 

5

/

8

" Hex Nut 

B  (1) Main Extension Arm  

M  (1) Anchor Footing Template 

C  (2) Parallel Linkage  

N  (4) Anchor Footing Rebar  

D  (1) H-Frame Backboard Mount  

O  (8) 

5

/

16

" x 1" Machine Screw

E (1) 

Spring-Assist 

Cartridge 

P  (8) 

5

/

16

" Flat Washer

F  (1) Crank Adjustment Cylinder 

Q  (8) 

5

/

16

" Lockwasher

G  (2) ½" x 4½" Hex Bolt  

R  (8) 

5

/

16

" Hex Nut

H  (5) ½" x 10" Hex Bolt 

S  (1) Rim Height Sticker

I (1) ½" x 11" Hex Bolt 

T  (1) Rim Height Indicator

J (8) ½" Locknut   

U  (4) 

5

/

8

" Lockwasher

K (4) 

5

/

8

" Anchor Bolt Lubricant 

V  (1) Anti-seize

 

 

 

W  (2) Pivot Stop Caps