3. Operation
When the power is switched on, the instrument initialises. During that process, the
time is displayed.
After approx. 20 seconds the process is finished, and the measured values are
displayed.
3.1. Desktop
With factory settings, the display shows at the top the instrument name and the time,
followed by the current measured value and the temperature.
In the bottom line, the triangular symbol shows the way to the menu (key DOWN, or
just touch the triangle if you have a touch screen instrument). On the right side of the
bottom line, current events are displayed.