2. Instructions for installation and connections
Dr. A. Kuntze
I
Gutes Wasser mit System
Robert-Bosch-Str. 7a
40668 Meerbusch
+49 (0) 2150-7066-0 / Fax -60
www.kuntze.com
12
2.2. Installation panel-mounted housing
Prepare an opening of 138 x 138 mm. Clip the
installation frame into the opening.
Place the instrument inside the frame and secure
it with the M4 x 25 screws. Tighten the screws
until the instrument is firmly fixed.
Attention
To preserve the protection class, the flat gasket of the housing
and the sealing ring of the frame must be used!
Содержание Neon pR
Страница 1: ...Neon pR Dr A Kuntze manual...