
Standard Decontamination Shower
HM1001C
Shower
Assembly
A. Remove, inspect, and count all parts (see Parts List below).
B. Connect the Bottom U-Bases (#1) and Extenders (#2).
C. Insert shower uprights (#3, #4, and #5) into corners of base. Note: Valve Upright
(#5) should be placed on the side of nearest water supply. Aim shower heads so
that the spray pattern is vertical and inside of opposite upright.
D. Connect Top U-Bases (#6) and Extenders (#2) to form Top Assembly
E. Connect Top Assembly to Uprights.
F. Connect Hand Held Spray Hose (#7) with Nozzle (#8) to bottom outlet in Valved
Upright. Attach Hand Held Hose Hanger (#9) to Valved Upright.
G.
Attach Water Supply Hose to upper inlet in Pressure Reducing Valve (#10). The
optimum shower operation is attained when at least 15 gpm (30-50 psi) of water is
supplied to the shower inlet. If water supply is greater than 90 psi pressure, use
the included pressure reducer coupling between the water supply hose and the
upper inlet.
H.
Place Shower Enclosure (#11) on top of shower as shown with window on the same
side as Spray Upright (#4).
Parts List
Replacement parts are available, contact DQE to order.
PART
NAME
QTY
PART
NUMBER
1. Bottom U-Base (blue tape)
2
HMPT1001C5
2.
Extender
4
HMPT1001C6
3.
Upright
2
HMPT1001C3
4.
Spray
Upright 1
HMPT1001C2
5.
Valve
Upright
1
HMPT1001C4
6. Top U-Base (red tape)
2
HMPT1001C1
7. Handheld Spray Hose
1
HOSEBLUE
8. Fan Spray Nozzle
1
HM214
9. Handheld Hose Hanger
1
HMPT10017
10. Water Pressure Regulator
1
HM212
11.
Shower
Enclosure
1
HM1055
12. Vinyl Carry Bag (body) 1
BAGSTDB
(not shown)
13. Vinyl Carry Bag (uprights)
1
BAGSTDU
(not shown)
14. Stakes (not shown)
2
HMPTSTAKE
15. Straps (not shown)
2
HMPTSTRAP
SAVE THESE INSTRUCTIONS
FOR IMPORTANT OPERATING,
PARTS, MAINTENANCE, AND WARRANTY INFORMATION
PART CODE
For shower warranty
PAGE 1
www.dqeready.com | p. 800-355-4628 | f. 317-295-9822 | [email protected]
3
3
5
10
8
7
9
11
6
6
1
1
2
2
2
2
4