
Decono® Shower
HM2000C
Assembly Instructions
A. Remove, inspect, and count all parts (see Parts List below).
B. Assemble base by connecting the two Shower Support Legs (#1) to the
Upright Valve Coupling (#2).
C. Insert Vertical Upright (#3) into Upright Valve Coupling (#2).
D. Insert Shower Head Attachment (#4) in Vertical Upright (#3) as shown.
E. Attach water hose (garden hose fitting) to Brass Hose Shutoff (#5)
at base of shower.
F. If water supply is greater than 90 psi pressure, use the Pressure Reducing
Valve (#6) between the water supply hose and the Brass Shutoff Valve (#5).
Parts List
Replacement parts are available. Contact DQE to order.
PART
NAME
QTY
PART
NUMBER
1. Shower Support Legs
2
HMPT2000C1
2. Upright Valve Coupling
1
HMPT2000C2
3. Vertical
Upright
1 HMPT2000C3
4. Shower Head Attachment
1
HMPT2000C4
5. Brass Hose Shutoff
1
N115C
6. Water Pressure Regulator
1
HM212
7. Carry Bag (not shown)
1
BAGD
8. Sandbags (not shown)
2
HM1075
www.dqeready.com | p. 800-355-4628 | f. 317-295-9822 | [email protected]
1
1
2
3
4
5 6
SAVE THESE INSTRUCTIONS
FOR IMPORTANT OPERATING, PARTS, AND MAINTENANCE INFORMATION
PART CODE
For shower warranty