The last cable tie should be just above where the cable will enter the pedestal where the Cable Gland
was installed.

2.2.3.2 Cable Routing Inside the Pole

1. Drill an Entry Port in the Pole Cap. Install the cap in the top of the pole.

2. Drill an Exit Port in the pole so the cable can be put through the pole.

NOTE:

Make sure these holes are large enough to accommodate the SMA cable connector.

3. Put the SMA connector end of the cable through the top of the pole and through the Exit Port.

4. Use a silicone sealant to seal the Entry Port in the cap in the top of the pole and the Exit Port after the

connections are made.

2.3 Complete the Installation

1. Install the cable through the Cable Gland.

2. Connect the SMA connector to the Antenna Connector of the AVI board in the terminal.

3. Connect the 20-1732 terminal connections to the J1 Terminal Block of the VIS board. Connect the 4-

Pin Molex connector to an open Power Supply connector.

Installation Manual - Revision: 0 - DRAFT | Dover Fueling Solutions

15

Содержание Petro Vend M1040-ANT

Страница 1: ...Installation Manual Part Number M1040 ANT Revision 0 Automatic Vehicle Identification Antenna ...

Страница 2: ...OLUTIONS and other trademarks referenced herein are trademarks of Delaware Capital Formation Inc Dover Corporation Dover Fueling Solutions UK Ltd and their affiliated entities Contact OPW Fuel Management Systems Visit us at https www doverfuelingsolutions com or contact us at Call 1 877 OPW TECH 877 679 8324 For calls outside US and Canada call 1 708 485 4200 Monday through Friday 7 a m to 6 p m U...

Страница 3: ...omplete the Installation 15 2 3 1 Omni Antenna Installation Scenario Terminal VIS 16 2 4 Remote Installation 16 2 4 1 Omni Antenna Installation Scenario Remote VIS 16 Section 3 Panel Antenna 17 3 1 Components 17 3 2 Terminal Installation 17 3 2 1 Install the Flange 18 3 2 2 Assemble the Antenna and Bracket 19 3 2 3 Cable Routing 21 3 2 3 1 Cable Routing Outside the Pole 22 3 2 3 2 Cable Routing In...

Страница 4: ...2 Panel Antenna Canopy Installation Scenario Terminal VIS 24 3 4 Remote Installation 25 3 4 1 Panel Antenna Installation Scenario Remote VIS 25 Installation Manual Revision 0 DRAFT Dover Fueling Solutions 4 ...

Страница 5: ... avoid the possibility of explosion or fire when you install these components near the Hazardous Area use pneumatic tools only Be sure your system is completely de energized before you do the installation DANGER Make sure that the pole used to install the antenna is not grounded to the terminal or other system components Make sure the antenna is isolated from the pole Use a non conductive material...

Страница 6: ...containers that can release hazardous vapors from flammable liquids or gases n A failure or incorrect operation of positive mechanical ventilation precautions result in the release of hazardous concentrations of flammable gases or vapors n Concentrations of flammable gases or vapors can occasionally flow from a containment or ventilation system to an adjacent Class I Division 1 location This flow ...

Страница 7: ...recommended to do a check of the electrical system with a multimeter to make sure all connections are de energized before you proceed with the installation Installation Manual Revision 0 DRAFT Dover Fueling Solutions 7 ...

Страница 8: ...installed VIS or remote VIS for optimum antenna performance 2 1 Components The Omni Antenna kit OPW FMS P N 20 4502 1 has these components l Antenna base stem assembly tool and 12 cable OPW FMS P N 75 3067 l Bracket OPW FMS P N 51 0589 l Cable Gland OPW FMS P N 50 0567 Installation Manual Revision 0 DRAFT Dover Fueling Solutions 8 ...

Страница 9: ...ge and pole are recommended NOTE If the pole needs additional support it can be clamped to a nearby support or structure DO NOT clamp the pole to the pedestal or terminal 2 2 1 Install the Flange DANGER Do not use electric or battery operated power tools To avoid the possibility of explosion or fire when you install these components near the Hazardous Area use pneumatic tools only Be sure your sys...

Страница 10: ...fasteners for the material where the flange is installed 2 2 2 Assemble and Install the Antenna 1 Put the antenna stem over the threaded post of the base and turn clockwise to tighten Be sure that the stem is flush with the bottom of the post Installation Manual Revision 0 DRAFT Dover Fueling Solutions 10 ...

Страница 11: ...2 Put the right angle connector of the cable through the center hole of the long part of the bracket Installation Manual Revision 0 DRAFT Dover Fueling Solutions 11 ...

Страница 12: ...hown above Use the plastic assembly tool that was included in the kit to tighten the antenna to the connector 4 Install the clamps through the cut outs in the bracket as shown above Installation Manual Revision 0 DRAFT Dover Fueling Solutions 12 ...

Страница 13: ...as shown above and tighten the clamps 6 Install the pole into the flange Turn the pole clockwise until the pole is almost to the end of the threads and the antenna points in the correct direction Installation Manual Revision 0 DRAFT Dover Fueling Solutions 13 ...

Страница 14: ... terminal enclosure 2 2 3 Cable Routing The Antenna Cable can be attached to the outside of the pole or put through the inside of the pole 2 2 3 1 Cable Routing Outside the Pole As an alternative the cable routing can go outside the pole l Use cable ties at regular intervals to attach the cable to the outside of the pole Installation Manual Revision 0 DRAFT Dover Fueling Solutions 14 ...

Страница 15: ... the SMA connector end of the cable through the top of the pole and through the Exit Port 4 Use a silicone sealant to seal the Entry Port in the cap in the top of the pole and the Exit Port after the connections are made 2 3 Complete the Installation 1 Install the cable through the Cable Gland 2 Connect the SMA connector to the Antenna Connector of the AVI board in the terminal 3 Connect the 20 17...

Страница 16: ...install the Remote VIS refer to M00 20 8225 AVI 2 4 1 Omni Antenna Installation Scenario Remote VIS For maximum antenna range install the antenna a minimum of 12 feet from ground level The remote VIS enclosure should be installed at eye level Installation Manual Revision 0 DRAFT Dover Fueling Solutions 16 ...

Страница 17: ...et l 15 Cable OPW FMS P N 12 1305 l Cable Gland OPW FMS P N 50 0567 3 2 Terminal Installation To install the Panel Antenna at the terminal with a terminal installed VIS you will need l 2 diameter x 12 length minimum pole galvanized or aluminum One end must be threaded to fit the threads of the flange IMPORTANT Do not use cable extensions Use of a cable extension can have an unwanted effect on the ...

Страница 18: ...installation DANGER Make sure that the pole used to install the antenna is not grounded to the terminal or other system components Make sure the antenna is isolated from the pole Use a non conductive material between the antenna bracket and the metal pole l Install the flange so the pole will be close to the left side of the pedestal Use the correct bit and fasteners for the material where the fla...

Страница 19: ...ign the four 4 holes as shown in the illustration above with the four 4 threaded inserts on the back of the antenna n Put a Flat Washer and Lock Washer over each hole n Put a short Hex Cap Screw into each hole and tighten the screws 2 Assemble the Pole Wall Mount MNT 22 3 to the Angle Bracket MNT 22 2 n Align the two parts so that their toothed surfaces point to each other and the holes are aligne...

Страница 20: ...et MNT 22 4 to the Pole Wall Mount MNT 22 3 v Put a Flat Washer and Lock Washer over the two 2 inside screw holes of the Pole Bracket v Put a 5 16 18 x 5 Hex Cap Screw through both holes and through the two 2 inside screw holes of the Pole Wall Mount v Put a 5 16 18 Hex Nut onto the end of both screws and tighten them n Adjust the antenna angle for best performance v Loosen the nut slightly for th...

Страница 21: ...ll the pole into the flange Turn the pole clockwise until the pole is almost to the end of the threads and the antenna points in the correct direction l Install the Cable Gland into the terminal Use a 3 4 punch to open the knockout on the top of the terminal Make sure the rubber seal is under the top nut and is tight enough to keep moisture out of the terminal enclosure 3 2 3 Cable Routing The Ant...

Страница 22: ...utside the Pole As an alternative the cable routing can go outside the pole l Use cable ties at regular intervals to attach the cable to the outside of the pole Installation Manual Revision 0 DRAFT Dover Fueling Solutions 22 ...

Страница 23: ... the SMA connector end of the cable through the top of the pole and through the Exit Port 4 Use a silicone sealant to seal the Entry Port in the cap in the top of the pole and the Exit Port after the connections are made 3 3 Complete the Installation 1 Install the cable through the Cable Gland 2 Connect the SMA connector to the Antenna Connector of the AVI board in the terminal 3 Connect the 20 17...

Страница 24: ... 3 3 2 Panel Antenna Canopy Installation Scenario Terminal VIS The Panel Antenna can be installed under a canopy The cable can beinstalled to a terminal installed VIS or a Remote VIS enclosure Installation Manual Revision 0 DRAFT Dover Fueling Solutions 24 ...

Страница 25: ...f the Remote VIS enclosure 3 4 1 Panel Antenna Installation Scenario Remote VIS Install the Panel Antenna on a wall with fasteners applicable for the material where the antenna will be installed For instructions on how to assemble and install the supplied antenna bracket go to the manufacture s site at https mars antennas com product mnt 22 For maximum antenna range install the antenna at approxim...

Страница 26: ...sion ECO Effective Software Version Key Changes 0 1966 10 15 2021 Initial Release NOTE It is possible that older software versions might not support all features Installation Manual Revision 0 DRAFT Dover Fueling Solutions 26 ...

Страница 27: ......

Отзывы: