Safe handling of the used material, oper-
ating and auxiliary materials
Training for operation, maintenance and
troubleshooting
Dürr Systems offers special product training
2.5
Personal protective equipment
Wear the required personal protective equip-
ment when working. Provide the following
personal protective equipment:
3
Transport, scope of supply
and storage
3.1
Scope of delivery
The scope of supply includes the following
components:
Spray gun
Tool kit
Inspect delivery on receipt for completeness
and integrity.
Report defects immediately
3.2
Handling of packaging material
ENVIRONMENT!
Environmental damage due to wrong
disposal
Wrongly disposed packaging material
may not be re-used or recycled. It harms
the environment.
– Dispose of material no longer
required in an environment-friendly
manner.
– Observe local disposal specifica-
tions.
3.3
Storage
Requirements for the warehouse:
Do not store outdoors.
Store in a dry and dust-free place.
Do not expose to aggressive media.
Protect from solar radiation.
Avoid mechanical vibrations.
Temperature: 10 °C to 40 °C
Relative humidity: 35 % to 90 %
4
Assembly
4.1
Requirements for the
Installation point.
It must be possible to disconnect the
compressed air supply and material feed
to the spray gun and secure it against
reconnection.
Lines, seals and screw connections must
be designed to conform to the spray gun
A fastening device capable of securing
the spray gun is required.
The control air supply must be adjustable.
The material feed must be through a filter
to avoid clogging of the nozzle.
4.2
Assembly
Stationary assembly
Protective equipment:
Protective workwear
Protective gloves
Observe the following at assembly:
Bore of the retaining bolt: 10 mm
Normal diameters:
1.
WARNING!
Sources of ignition may cause explo-
sions!
Ensure a non-explosive atmosphere.
Transport, scope of supply and storage
01/2017
EcoGun AL AUTO - MSG00012EN
7/40