Operating Manual
© Dürr Systems AG
124 / 156
EcoBell2 SL EC - Rotating Atomizer with External Charging
Faults
Document No.: MRA00001EN
Version:: 07
•
As of:: 01/2020
• Plug the two pins on the tool into the end of the light conductor
.
Fig. 475: End of light conductor with special tool
1
Pin on special tool
• Unscrew the light conductor from the valve block with the tool.
9.3.2
Cleaning the light conductor
If the interfaces of the light conductor are dirty, then they can be
cleaned with a damp cloth. But note the following points:
- Only slightly turn the light conductor.
- Do not bend the light conductor.
9.3.3
Testing the light conductor
• Direct one end of the light conductor towards a light source.
• Put the other end in a position where no light shines directly on the
cut surface.
In an intact light conductor, the cut surface is evenly illuminated.
If the light conductor is defective, it must be replaced.
9.3.4
Installing the light conductor
• Screw the light conductor into the valve block with the special tool.
• Attach chuck and hold it.
• Turn the valve block around.
• Tighten the screws on the inside of the valve block with 3.2Nm.
Pos: 64 /INP/ Bell2/08_08 Wellenarretie rung aus_ein @ 40\mod_1411045962244_20.do cx @ 502725 @ 233 @ 1
9.4
Mounting of the shaft detent
The shaft detent must be removed if it is defective or if the color tube
must be removed.
The valve block must be dismantled and the atomizer body removed.