
13
TP/TA EASY Safe
2020-11
dormakaba mounting instructions
Mounting
WN 060028 45532
4.7 Gluing the top door rail to an LSG
glass panel (optional)
The clamping of the top door rail is particularly
important because of the supporting function. If
vibrations are expected on the item, the glass panel
should also be glued in the top door rail area in
addition to the clamping.
The chambers in the gasket and the drill holes in the
door rail are already present. They are on the right
and left-hand on the face on the inside of the panel.
Requirements
• The top door rail is mounted on the glass panel.
• The glass panel is mounted.
1.
Inject the adhesive through the fill hole.
Fig. 29
Fill hole
Injecting the adhesive
2.
Stop the injection as soon as the adhesive
emerges from the outlet channel. The adhesive
chamber is completely full.
Fig. 30
Outlet channel for
checking the fill level
Adhesive chamber
Completely fill the adhesive chamber
3.
Leave the adhesive to cure.
The curing time is 15 minutes at a room
temperature of approx. 23°C.
4.
After 15 minutes, carefully remove excess adhesive
that has leaked out from the side.
5.
After a further 45 minutes, the door can be
carefully used.
Note
• The adhesive fully cures after 24 hours and
the unit can then be used normally.
• The 24-hour period starts 1 hour after
injecting the adhesive.
• Do not expose the door to any sudden
loads until the 24-hour period has expired.
4.8 Mounting the side panel
Note
The fixing materials are not included in
delivery. The fixing materials must be
suitable for the fabric of the building.
Fig. 31
7
25
25
Glass heigh
t =
panel heigh
t - 160
3
P
anel heigh
t
P
anel heigh
t + 10
Clearances for the side panel
1.
If necessary, shorten the bottom rail to the
required length.