
Inspection, Maintenance and Adjustment
4-43
DX380LC-7
250 Hour / Monthly Service
Perform All Daily and 50 Hour Service
Checks
Boom and Arm Joint Pin - Lubricate
Grease every 10 hours for first 100 hours and every 250 hours
thereafter.
NOTE:
If the unit has been running or working in water, the
front attachment must be greased on a 10 hour/daily
basis.
•
Position machine on firm and level ground as shown below
and lower the front attachment to the ground and stop
engine.
•
Press the grease fitting and inject grease with the grease
gun on the marked point.
•
After greasing, clean off the old grease that has been
purged.
B, C, D
E
F
G
A
EX1300743
Figure 37
Reference
Number
Description
A
Boom Cylinder Head Pin (2 Points)
B
Boom Foot Pin (2 Points)
C
Boom Cylinder Rod Pin (2 Points)
D
Arm Cylinder Head Pin (1 Point)
E
Boom Arm Joint Pin (2 Points)
F
Arm Cylinder Rod Pin (1 Point)
G
Bucket Cylinder Head Pin (1 Point)
Reference
Number
Description
Содержание DX380LC-7K
Страница 6: ...DX380LC 7 Table of Contents IV ...
Страница 19: ...Safety 1 1 DX380LC 7 1Safety ...
Страница 22: ...DX380LC 7 Safety 1 4 Information and Location for Safety Decals DS1900721 24 24 15 16 1 Figure 2 ...
Страница 196: ...DX380LC 7 Operating Controls 2 98 ...
Страница 399: ...Transportation 5 7 DX380LC 7 2 2 3 3 2 2 3 3 EX1300750 Figure 13 ...
Страница 406: ...DX380LC 7 Specification 6 6 Working Range 0 M A B I K L F C J H D d E G G L EX1401493 2 500 mm Figure 5 ...
Страница 418: ...DX380LC 7 Specification 6 18 ...