6
Donaldson™ iCue™ Sensor Integrated Gateway
1. Connect the cellular antenna and hand tighten.
2. Restore power to the gateway.
3. Once the gateway is energized and the through it’s startup
routine (all LEDs Red, Orange, Green). Verify the Power and
iCue Service Connectivity LEDs turn green. This may take
several minutes.
Gateway Final Assembly
5
Replacement Parts List
Part Number
Description
R060015
Kit, Sensor Gateway, North America (includes antenna, power supply, Sensor
Gateway Assembly, magnet, tubing and fittings)
R060028
Sensor Gateway Assembly
R060020
Antenna, RF, 4G LTE
R060021
Power Supply, 24VDC, 40W