background image

Vibra-Shake, VS-550  to VS-3000

 10

Instruct all personnel on safe use and maintenance 

procedures.

Electrical work during  

installation, service or 

maintenance must be performed by a qualified 

electrician and comply with all applicable 

national and local codes.
Turn power off and lock out all power before 

performing service or maintenance work.
Check that the collector is clear and free of all 

debris before starting. 
Do not install in classified hazardous 

atmospheres without an enclosure rated for 

the application.
Optional fans over 600 lbs must be 

independently supported.

Preliminary Start-Up Check

1.  Check all electrical connections for tightness and 

contact.

2.  Check for proper rotation as noted on the fan and/or 

hopper discharge device housing.

 

To reverse rotation, single-phase power supply: 

Follow manufacturer’s instructions on the motor’s 

nameplate.

 

To reverse rotation, three-phase power supply: 

Switch any two leads on the motor junction box.

Do not look into fan outlet to 

determine rotation.  View the 

fan rotation through the back of the motor.
Check that the exhaust plenum is free of tools 

or debris before checking blower/fan rotation.
Stand clear of exhaust to avoid personal injury. 
Do not interchange a power lead with the 

ground wire. Severe  personal injury and/or 

property damage may result.

3.  All access panels should be sealed and secure.
4.  Check that the dust container is properly sealed and 

clamped.

5.  Check and remove all loose items in or near the inlet 

and outlet of the collector.

6.  Check that all remote controls are properly wired 

and all service switches are in the OFF position.

7.  Check that all optional accessories are installed 

properly and secured.

8.  Turn power ON at source.
9.  Turn fan motor ON.

Содержание Vibra-Shake VS-1200

Страница 1: ...owner Leave with the collector when set up and start up are complete Donaldson Company reserves the right to change design and specifications without prior notice Illustrations are for reference only...

Страница 2: ...ach of these responsibilities are met As a manufacturer and supplier of Industrial Filtration Products Donaldson can assist process owners operators in the selection of filtration technologies However...

Страница 3: ...ating and Specification Information 1 Operation 2 Inspection on Arrival 3 Installation Codes and Procedures 3 Installation 3 Foundations or Support Framing 3 Collector Location 4 Site Selection 4 Rigg...

Страница 4: ...the cartridge acts as a cleanable secondary filter The Vibra Shake dust collectors standard features include an acoustic lined blower chamber and automatic filter cleaning Designed to increase the ver...

Страница 5: ...ugh the center of the filter cartridge to the blower through the silencer and exits through the top clean air outlet Model VS is an intermittent duty collector which means that cleaning starts when th...

Страница 6: ...remove shipping materials from the collector will compromise collector performance Inspect collector to ensure all hardware is properly installed and tight prior to operating collector The collector...

Страница 7: ...nts to ensure adequate crane capacity Allow only qualified crane or forklift operators to lift the equipment Refer to applicable OSHA regulations and local codes when using cranes forklifts and other...

Страница 8: ...air chambers and dust drawers Locate the collector as close to the dust source as possible except where explosive or flammable material exists Anchors must comply with local code requirements and mus...

Страница 9: ...than baseplate hole diameter 3 Corrosive environment or outdoor installation may require stainless steel anchors 6 Position and bolt the cross brace in place using the hardware provided Do not tighte...

Страница 10: ...e toward the outside of the bolt pattern 2 Lift the cabinet into position over the leg and hopper assembly and lower slowly Note Access the lifting lugs on VS 2400 and VS 3000 by removing the top cove...

Страница 11: ...the fan motor and control box Use appropriate wire gauge for rated amp load as specified by local codes Electrical Wiring Electrical installation service or maintenance work must be performed by a qu...

Страница 12: ...down time 60 second single shaker motor 180 second double shaker motor 3 60 second cleaning cycle 4 No time delay on start up If start up is initiated during the cleaning operation the shaker motor wi...

Страница 13: ...rotation single phase power supply Follow manufacturer s instructions on the motor s nameplate To reverse rotation three phase power supply Switch any two leads on the motor junction box Do not look i...

Страница 14: ...performed by a qualified electrician and comply with all applicable national and local codes Turn power off and lock out all power before performing service or maintenance work Do not install in class...

Страница 15: ...gate is used close gate before servicing dust container Sharp edge of slide gate may result in personal injury while closing the slide gate Keep hands clear when operating the slide gate 4 Check integ...

Страница 16: ...lange using 3 8 16 bolts washers and hex nuts 3 Attach the drum cover to the 55 gallon drum Optional Equipment 4 Use latches to secure the cover to the drum if equipped 5 Connect the flexible hose bet...

Страница 17: ...hout Slide Gate 5 Gallon Pail Pack 1 Apply sealant to the hopper flange or the pail cover mounting plate flange toward the inside edge of the bolt pattern 2 Fasten the pail pack to the hopper using th...

Страница 18: ...me 90 sec Single VS 550 1200 and 1500 Switches preset to OFF position Default set to 60 sec wait 60 sec clean ON 1 2 3 4 180 sec wait 30 sec clean 60 sec time 90 sec Double VS 2400 and 3000 Switch 1 t...

Страница 19: ...aker spring cotter pin shaker bar shaker bolt jam nut Single and Double Shaker Assembly pressure switch low pressure port open to clean air chamber clean air chamber 3 16 in ID tubing connect to high...

Страница 20: ...t do not stay running Incorrect motor starter installed Check for proper motor starter and replace if necessary Access doors are open or not closed tight Close and tighten access doors See Filter Inst...

Страница 21: ...ation Collapsed or obstructed ductwork Remove and clean duct Replace collapsed duct Improper duct size or too much flexible duct Contact Donaldson Torit for assistance Collapsed or obstructed ductwork...

Страница 22: ...timing sequence to start Check pressure switch adjustment if adjustable Turn screw clockwise until it stops and back out approximately three turns counterclockwise Faulty pressure switch With power to...

Страница 23: ..._____________________________________________________________ Dust Properties Kst_______________Pmax______________MIE____________MEC_________________ Accessories_______________________________________...

Страница 24: ...other costs expenses or damages whether direct indirect special incidental consequential or otherwise The terms of this warranty may be modified only by a special warranty document signed by a Direct...

Отзывы: