Downflo II, Models DFT 2-4 and DFT 3-6
9
Leg Installation
Leg sets are designed for standard height collectors
and are rated Seismic Zone 4. Reference the
drawing shown below and the leg assembly
drawing shipped with the leg set for proper
location and assembly.
1. Lift the cabinet and hopper assembly to a
suitable height. Attach each leg with 3/4-10 x 1
3/4 or 2 1/2-in bolts, washers, and nuts as
shown in Leg and Cross Brace Assembly.
Do
not tighten hardware at this time.
2. Recheck the position of the leg sets and cross
braces.
3. Using a crane, lift the assembled unit onto the
anchor bolts. Fasten each leg pad to the anchor
bolts using flat washers, lock washers, and hex
nuts provided by others.
Do not tighten
hardware at this time.
4. Level unit. Tighten all hardware on legs, cross
braces, and foundation anchors.
5. Remove crane.
Note:
Tighten all hardware before removing
crane.
Leg and Cross Brace Assembly
%PP0IK&SPX(IXEMPW
\MR+V,I\&SPX
MRJPEX[EWLIV
MRPSGO[EWLIV
MRLI\RYX
Содержание Downflo II DFT 2-4
Страница 45: ...Downflo II Models DFT 2 4 and DFT 3 6 45 e t a D d e m r o f r e P e c i v r e S s e t o N Service Notes...
Страница 46: ......
Страница 47: ......