Head rail Brackets
2 Bar Bottom Fixing Blocks
3 Bar Bottom rail Brackets
2 Bar Bottom Fixing Blocks
SKYSOL 2
MANUAL
-
Installation Instructions
Unpacking and Initial Installation
Check blind is the correct one for the window by measuring the width/drop dimensions – see label on plastic sleeve – as
shaped handed pairs can look similar.
Take off elastic bands and ensure the cords and wires are free from obstruction. Allow blind to open by holding the head rail
and letting the moving rail and/or bottom rail drop.
For a 2 bar blind the cords/guide wires need to run in a straight line centrally through the holes in the fabric. The vast majority
of blinds require the cords/guide wires to be mounted perpendicular to the head rail. Make sure you position the fixing blocks
correctly. Once all brackets are in place clip the head rail into its brackets.
Offer blind up to window to determine the positions for the mounting brackets. The recommended locations for the fixing
brackets are indicated on the back of the head rail (and the inside of the bottom rail on 3 bar blinds) by a round black sticker.
Make sure that there is enough room behind the brackets to be able to access the release clip.
Then clip the bottom rail or bottom fixing blocks in place, make sure that the head rail and bottom rail or fixing blocks are
aligned.
Face Fix Mounting
Top Fix Mounting
Face Fix Mounting
Top Fix Mounting
Face Fix Mounting
Top Fix Mounting
Head rail - Clipping into Position A
Head rail - Clipping into Position B
Clipping into Position Face Fix
Clipping into Position Top Fix
©
Dometic UK Blind Systems Ltd
Dometic UK Blind Systems Ltd
Chichester PO20 0AY England
t: +44 (0)1243 606909 f: +44 (0)1243 608300 www.
dometic.com
e:
CRN 109, Issue 3, May 2009